Brooklyn · Block 7325 · Lot 75 · 11229

2481 Ocean Avenue

7 floors · 26 apartments · 30,024 sq ft · built 2007 · class D1 · owner of record: 2481 Ocean Ave Llc

10open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 64 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 80 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 116 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 30,024 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 429 days
Next cycle year 2027

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2401461
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
HPD (7) · C 0 · B 5 · A 2
IssuedClassViolationCorrect by
Feb 6, 2025AApt 5D · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CAULKING SURFACE OF VISIBLE MOLD AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM NORTH AT EASTMay 12, 2025
Feb 5, 2025BApt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM NORTH AT EASTMar 12, 2025
Feb 5, 2025B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB AT COMPACTOR CLOSET, 5th STORYMar 12, 2025
Oct 10, 2024B§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE DOOR HANDLE AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORYNov 14, 2024
Jul 2, 2024BApt 4A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCES OF LOWER SASHES AT BOTH WINDOWS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4A, 4th STORY, 3rd APARTMENT FROM SOUTH AT WESTAug 6, 2024
Mar 9, 2022BApt 3B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTApr 13, 2022
Feb 9, 2022AApt 6A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TILE AT FLOOR IN THE KITCHENETTE LOCATED AT APT 6A, 6th STORY, 3rd APARTMENT FROM SOUTH AT WESTMay 15, 2022

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 5:30 PM ET. BBL 3073250075.

Look up another building