2 floors · 21,020 sq ft · built 1990 · class K2 · owner of record: Ferazzoli Mario
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 413 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-30 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 11, 2016 | Boilers CLASS - 2 50A,50C,B254,50B,50A. FULTON V.T. BOILER, 10HP, DB92953,HPSTM, GAS FD,2003; 50A-CORRODED UPPER AND LOWER HAND HOLE PORT SLEEVES.REPLACE ALL;50B-CORROSION AND LEAKAGE AT FEED WAER INLET CHECK VALVE AND PIPING. #32077138R | Aug 30, 2016 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01506 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #02197 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00451 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #04035 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #02892 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #01661 | DOB VIOLATION - ACTIVE |
| Aug 31, 2021 | ELEVATOR #9027/707666 | DOB VIOLATION - ACTIVE |
| Aug 26, 2020 | ELEVATOR #9027/688329 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION #01117 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION #01090 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #11220 | DOB VIOLATION - ACTIVE |
| Jun 22, 2018 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION #00379 | DOB VIOLATION - ACTIVE |
| Jun 23, 2017 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION #00380 | DOB VIOLATION - ACTIVE |
| Dec 16, 2016 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION #00333 | DOB VIOLATION - ACTIVE |
| Mar 11, 2016 | CONSTRUCTION #CZMTF01KP | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION #01067 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION #00241 | DOB VIOLATION - ACTIVE |
| Nov 2, 2011 | CONSTRUCTION #CN1101MM | DOB VIOLATION - ACTIVE |
| Sep 22, 2008 | CONSTRUCTION #1105FA | DOB VIOLATION - ACTIVE |
| Oct 1, 2005 | LOCAL LAW 10/81 - ELEVATOR #04470 | DOB VIOLATION - ACTIVE |
| Jan 6, 1998 | LOCAL LAW 10/81 - ELEVATOR #02757 | DOB VIOLATION - ACTIVE |
| Apr 17, 1995 | LOCAL LAW 10/81 - ELEVATOR #03878 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2021 Internal Inspection Affirmation of Correction for HP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-HP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for HP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-HP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for HP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jun 22, 2018 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
| Jun 23, 2017 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
| Dec 16, 2016 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 3, 2015 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
| May 15, 2014 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
| Oct 1, 2005 | Elevators LL1081 | Active |
| Jan 6, 1998 | Elevators LL1081 | Active |
| Apr 17, 1995 | Elevators LL1081 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 5:36 PM ET. BBL 4081180028.