1 floors · 23,510 sq ft · built 1948 · class K1 · owner of record: United Properties Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-04-18 (Accepted). Agency page | Dec 31, 2026 in 65 days | 2 of 2 without an accepted 2026 report yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 11, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. OBSERVED METAL FENCE AT EXP # 3 REAR IS OUT OF PLUMB IN A APPROX. 16FT SECTION IN DANGER OF COLLAPSING, REPAIR AND/REPLACE #39188006L | Oct 13, 2026 DEFAULT | $2,530 |
| May 11, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER. OBSERVED METAL FENCE AT EXP # 2 ( COMMENCING ON 248TH STREET) IS OUT OF PLUMB IN A APPROX. 32FT SECTION IN DANGER OF COLLAPSING., REPAIR AND/REPLACE #39188007N | Oct 13, 2026 DEFAULT | $2,530 |
| Jan 21, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 35563529R. IN REFERENCE TO VIO #35507793J ISSUED ON 07/26/2021 FOR WORK WITHOUT PERMIT FOR PLUMBING AND GAS WORK AT REAR OF 248-05 UNION TU #39174559Y | Jan 26, 2027 DEFAULT | $6,280 |
| Dec 26, 2025 | Construction CLASS - 1 ATOI AT ABOVE PREMISES OBSERVED EXCESSIVE COMBUSTIBLE MATERIALS, AND GARBAGE BEING STORED AT THE REAR OF THE COMMERCIAL SPACE., MAINTAIN ADEQUATE CONSTRUCTION HOUSEKEEPING #39171663K | Mar 3, 2026 IN VIOLATION | $2,500 |
| Dec 26, 2025 | Construction CLASS - 1 ATOI AT ABOVE PREMISES OBSERVED AN UNDOCUMENTED/ UNPREMITTED REAR EXTENSTION ATTACHED TO BUILDING. NO PERMIT ON DOB RECORDS FOR SCOPE OF WORK., OBTAIN PERMIT #39171661R | Sep 1, 2026 DEFAULT | $12,500 |
| Dec 26, 2025 | Unknown CLASS - 1 ATOI AT ABOVE PREMISES OBSERVED ELECTRICAL DEVICES IN OPERATION INSTALLED IN AN UNPREMITTED/UNDOCUMENT EXTENSION AT REAR OF COMMERCIAL SPACE., OBTAIN PERMIT #39171662Z | Sep 18, 2026 DEFAULT | $2,530 |
| Aug 20, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR NOTICE OF VIOLATION #39027263P, SERVED ON 8/19/2020., FILE A CERTIFICATE OF CORRECTION #39157834P | Oct 28, 2025 IN VIOLATION | $1,250 |
| Jan 25, 2022 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35507793J ISSUED ON 07/26/21 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT. NOTED: AT REAR OF 248-05 UNION T #35563529R | Jul 19, 2022 IN VIOLATION | $0 |
| Nov 10, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35507793J ISSUED 7/26/21 AND FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK W/O PERMIT AT REAR OF RESTAURAN #35563850N | Jun 7, 2022 IN VIOLATION | $0 |
| Jul 26, 2021 | Construction CLASS - 1 WORK WITHOUT PERMITS- WORK NOTED-AT REAR OF 248-05 UNION TURNPIKE-ERECTED FULL HEIGHT PARTITION W/PLUMBING & GAS WORK TO CREATE AN OUTDOOR DINING W/SOATING-BUILDING LOT OF RANGE 248-05,248-07,248-09&248-11 LOT #35507793J | Oct 19, 2021 IN VIOLATION | $0 |
| Jul 1, 2021 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED CREATED 3-MASSAGE ROOMS, 2-BATHROOMS ON 1ST FLOOR AND 3-MASSAGE ROOMS IN CELLAR LEVEL WITH FULL HEIGHTS PARTITION, PLUMBING & ELECTRICAL WORK. NO RELATED PERMIT IN DOB RECORD., OB #39043869J | Aug 17, 2021 IN VIOLATION | $0 |
| Jul 1, 2021 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED PREMISES INCLUDE CELLAR OCCUPIED AS MASSAGE PARLOR WHICH OCCUPANCY CONTRARY TO EXISTING C OF O # Q-197563 DATED 03/24/82. EXISTING C OF O STATED OCCUPANCY AS STORES AND RESTAURANT #39043867X | Aug 17, 2021 IN VIOLATION | $0 |
| Aug 18, 2020 | Construction CLASS - 2 CONSTRUCTED A CEMENT BLOCK REAR EXTENSION OF APPROX. 30 FEET DEEP X 25 FEET WIDE X 15 FEET HIGH AT REAR OF THE BUILDING WITH A RETRACTABLE ROOF. OBSERVED NEW PLUMBING AND ELECTRICAL WORK IN THE NEW EXTENSION. N #39027263P | Oct 6, 2020 ADMIT/IN-VIO | $0 |
| Oct 22, 2014 | Construction CLASS - 2 FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF IN SPECTION.NO CONSTRUCTION DOCUMENTS AT JOB SITE AT TIME OF INSPECTION. ALT1 JOB#420177739 ISSUED 7/22/14 EXPIRES 7/20/15 (KEEP CONSTRUCTION #35152168Y | Dec 9, 2014 ADMIT/IN-VIO | $0 |
| May 12, 2013 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8 & 27-371(J).REAR EXIT DOOR HAS SLIDEBOLT LOCKS AND DEADBOLT LOCKED ON REAR DOOR.RMDY:REMOVE ILLEGAL #35014969Z | Jul 23, 2013 IN VIOLATION | $0 |
| Apr 28, 2012 | Unknown CLASS - 2 WORK W/O PERMIT:AT 1ST FLOOR REAR INSTALLED 2 PC BATHROOMS ON 1ST FLOOR. AT CELLAR LEVEL NEW STEEL BEAMS & PLUMBING. ALSO ELECTRICAL INSTALLED IN 1ST FLOOR COMM. SPACE.REM:OBTAIN PERMITS/RETSTORE TO PRIOR LEGAL #34955330X | Jun 12, 2012 STIPULATION/IN-VIO | $0 |
| Nov 5, 2009 | Construction CLASS - 1 OPERATION OF A PA W/O A CURRENT CERT OF OPERATION NOTE PREMISES ARRANGED FOR OCCUPANCY BY MORE THAN 75 PERSONS W/ THE TABLES & CHAIRS FOR APPX 110 PERSONS W/O A PA CERT OF OPERATION REM: OBTAIN CERT OF OPERATIO #34817667X | Jun 21, 2011 IN VIOLATION | $0 |
| Jun 13, 2009 | Construction CLASS - 1 OPERATION OF PLACE OF ASSEMBLY WITHOUT A CURRENT CERTIFICATE OF OPERATION C.O 3 INDICATE LEGAL OCCUPANCY OF 170 PERSONS BUT PREMISES HAS NO CURRENT PA REM: OBTAIN A PLACE OF ASSEMBLY CERTIFICATE OF OPERATION. #34784129K | Aug 4, 2009 IN VIOLATION | $0 |
| Jun 13, 2009 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY. C.O. 3197563 INDICATES CELLAR TO BE USED FOR ORDINARY STORAGE. CELLAR IS ARRANGED AS A P.A. SPACE WITH TABLE AND CHAIRS FOR APPROX 100 PERSON #34784131J | Aug 4, 2009 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 26, 2025 | CONSTRUCTION ATOI OBSERVED AN UNPREMITTED/ UNDOCUMENT REAR EXTENSION AT ABOVE PREMISES. NO PERMIT ON DOB RECORDS FOR SCOPE OF WORK. #25-03330 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01507 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00667 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION #00720 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION #01604 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #03619 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION #02491 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #01240 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION #00094 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #01320 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00112 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #04601 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #03439 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION #02079 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00958 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION #01085 | DOB VIOLATION - ACTIVE |
| Jun 22, 2018 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION #00368 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #17302 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #23068 | DOB VIOLATION - ACTIVE |
| Oct 12, 2001 | CONSTRUCTION #ZSTF10PM | DOB VIOLATION - ACTIVE |
| Oct 12, 2001 | CONSTRUCTION #ZSTF09PM | DOB VIOLATION - ACTIVE |
| Oct 12, 2001 | CONSTRUCTION #ZSTF05PM | DOB VIOLATION - ACTIVE |
| Oct 12, 2001 | CONSTRUCTION #ZSTF04PM | DOB VIOLATION - ACTIVE |
| Oct 12, 2001 | CONSTRUCTION #ZSTF01PM | DOB VIOLATION - ACTIVE |
| Oct 12, 2001 | CONSTRUCTION #ZSTF14PM | DOB VIOLATION - ACTIVE |
| Oct 12, 2001 | CONSTRUCTION #ZSTF13PM | DOB VIOLATION - ACTIVE |
| Oct 12, 2001 | CONSTRUCTION #ZSTF11PM | DOB VIOLATION - ACTIVE |
| Jun 18, 1992 | BOILER #H96575-01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO Violation Issued-Failure To File 2023 Internal High Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Jun 22, 2018 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
None open.