2 floors · 2 apartments · 3,371 sq ft · built 1931 · class K4 · owner of record: Arthur Avenue East 189th Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-17 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION OF A 2-STORY MIS USE BUILDING, I OBSERVED SIDEWALK SHED ERECTED AT BUILDING WITH VALID PERMIT DURING MY INSPECTION I NOTICED SIDEWALK SHED HAS NO CONTACT INFORMATION PANEL. THIS CREATE A H #39545163H | Dec 5, 2025 ADMIT/IN-VIO | $0 |
| Apr 9, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLA ION #32096959H ISSUED ON 6/07/2018 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTABLE #37014633H | Jun 7, 2019 IN VIOLATION | $625 |
| Jun 7, 2018 | Boilers CLASS - 2 B254,19B,5A,36,50. 50-NEED TO PIPE SAFETY TO GROUND. #32096959H | Aug 3, 2018 STIPULATION/IN-VIO | $315 |
| Issued | Violation | Status |
|---|---|---|
| Jun 27, 2025 | CONSTRUCTION EMERGENCY WORK.THE NORTH WALL WAS BULGING.THE SECOND FLOOR JOISTS ARE NOT PROPERLY SUPPORTED.IMMED DO:INSTALL TEMPORAR SIDING TO SPPRT 2NDFL JOISTS UNDER DRCT&CONTINUOUS SUPERVISION OF PE,2.INSTLL SDWLK SHED #FEU20601XC | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 2:38 PM ET. BBL 2030660046.