| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-05 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 25, 2026 | Construction CLASS - 1 UNLAWFUL ACTS - FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. AT TIME OF INSPECTION, NO PERMITS WERE FOUND ON FILE WITH THE DEPARTMENT OF BUILDINGS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER AND CERTIF #39205657R | Dec 4, 2026 PENDING | $2,500 |
| Feb 24, 2025 | Plumbing CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER: LACK OF A SYSTEM OF AUTOMATIC SPRINKLERS WHERE REQUIRE PER BC 903.2; 27-954 I OBSERVED ON THE FIRST FLOOR HALLWAY INSTALLED TWO COMMERCIAL ELECTRIC DRYERS #39139334J | Jun 27, 2025 IN VIOLATION | $1,250 |
| Feb 24, 2025 | Construction CLASS - 2 OBSERVED ON THE FIRST FLOOR LOBBY HALLWAY INSTALLED TWO COMMERCIAL WASHING MACHINES AND TWO COMMERCIAL ELECTRIC DRYERS WHICH IS IN A PROHIBITED LOCATION. ALSO INSTALLED TWO PRO VENTS FOR TWO WASHING MACHINES WE #39139333H | Dec 8, 2025 IN VIOLATION | $0 |
| Mar 17, 2022 | Construction CLASS - 1 OBSERVED TWO COIN OPERATING LAUNDRY MACHINES INCLUDING WASHERS AND DRYERS INSTALLED AT PUBLIC HALLWAY FIRST FLOOR LOBBY. NO DOB PERMITS ON FILE., OBTAIN PERMIT #39058269H | Oct 24, 2022 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Apr 14, 2006 | CONSTRUCTION #0601SH | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 26, 2026 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF ILLEGALLY INSTALLED COMMERCIAL WASHER AND DRYER AT PUBLIC HALL, 1st STORY | Feb 1, 2026 |
| Sep 15, 2025 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME READILY ACCESSIBLE FOR SIGNATURE, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT MISSING AT PUBLIC HALL, 1st STORY | Dec 19, 2025 |
| Feb 25, 2025 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF ILLEGALLY INSTALLED COMMERCIAL WASHER AND DRYER AT PUBLIC HALL, 1st STORY | May 31, 2025 |
| Feb 25, 2025 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF ILLEGALLY INSTALLED COMMERCIAL WASHER AND DRYER AT PUBLIC HALL, 1st STORY | Mar 3, 2025 |
| Jul 19, 2019 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF REDUCED HEIGHT OF THE CEILING TO 6 FT. AT INTERMEDIAM LANDING BETWEEN 1ST AND 2ND STORYS AT PUBLIC HALL | Aug 23, 2019 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | ECB | Construction: UNLAWFUL ACTS - FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. AT TIME OF INSPECTION, NO PERMITS WERE FOUND ON FILE WITH THE DEPARTMENT OF BUILDINGS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER AND CERTIF | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 11:20 PM ET. BBL 2030780001.