Manhattan · Block 1239 · Lot 23 · 10025

2460 Broadway

13 floors · 94 apartments · 150,033 sq ft · built 1917 · class D4 · owner of record: 215 W 91 St Corp

22open violations
$2,500ECB/OATH penalties owed
6HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 69 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 85 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $27,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 121 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 150,033 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1165 days
Next cycle year 2029
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1239). Agency page

Dec 31, 2029
in 1165 days
Next due 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-10 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $2,500 owed
IssuedViolationHearingBalance
May 7, 2024Construction CLASS - 1
UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. NOTE: AS PER VIOLATION #060921LL10702L5, OWNER WERE TO IMMEDIATELY RETAIN A NYS PROFESSIONAL PE OR RA TO PERFORM A 100% HANDS ON INSPECTION OF ALL
#35681813L
Jul 11, 2024
IN VIOLATION
$2,500
DOB (6)
IssuedViolationStatus
Jun 9, 2021CONSTRUCTION
FAILURE TO COMPLY. ON 2/3/20, COMMISSIONER'S ORDER 322185 (020320CLL10702OS)WAS ISSUED TO THE OWNER TO IMMED RETAIN NYS LIC PROF TO CONDUCT 100% HANDS ON INSPECTION OF ALL CORNICES & PARAPET WALLS FACING PUBLIC RIGHT OF WAY TO EVAL SAFETY OF SAME. AS OF 6/9/21 OWNER HAS NOT COMLIED W/IMMED CURE ORDE
#LL10702LS
DOB VIOLATION - ACTIVE
Apr 29, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2000855
DOB VIOLATION - ACTIVE
May 31, 2018NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
#01439
DOB VIOLATION - ACTIVE
Oct 1, 2015LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
#00086
DOB VIOLATION - ACTIVE
Feb 1, 2013CONSTRUCTION

#0702SP
DOB VIOLATION - ACTIVE
Aug 8, 2002LOCAL LAW 11/98 - FACADE

#NRF51058
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Apr 29, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
May 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Active
Oct 1, 2015Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Active
HPD (11) · C 6 · B 5 · A 0
IssuedClassViolationCorrect by
Apr 15, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL WALL OUTLETS THRU OUT 9 STY WEST ATP 93 EASTMay 20, 2026
Apr 15, 2026B§ 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT ROOF, AT PUBLIC HALLMay 20, 2026
Apr 15, 2026B§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF OF ALL EXIT DOORS TO FIRE STAIRS ( ABC) OPEN EGRESS TO PUBLIC HALL, WITHOUT WIRE GLASS PANES AT PUBLIC HALL STAIRS, 11th STORYMay 20, 2026
Apr 15, 2026C§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK ON BUILDING ENTRANCE DOOR FROM STREET AT PUBLIC HALL, 1st STORYApr 21, 2026
Apr 15, 2026B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF THE STORAGE OF 4 GARBAGE CANS, AT PUBLIC HALL, 11th STORYMay 20, 2026
Apr 15, 2026C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF PADLOCK AT GATE TO FENCE , EAST SECTION, FRONT COURTApr 21, 2026
Apr 15, 2026BApt 82 · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTLINE AT BATHTUB IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 82, 8th STORY, 1st APARTMENT FROM SOUTH AT WESTMay 20, 2026
Apr 15, 2026C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF LOCKING DEVICE CAPABLE OF RECEIVING A PADLOCK AT GATE TO FENCE , EAST SECTION, FRONT COURTApr 21, 2026
Mar 11, 2022CApt 82 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING ( APPROX 30 SQFT) AND WEST WALL (APPROX 20 SQFT) IN THE 1st ROOM FROM NORTH LOCATED AT APT 82, 8th STORY, 1st APARTMENT FROM SOUTH AT WESTApr 6, 2022
Mar 11, 2022CApt 82 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING ( APPROX 40 SQFT) IN THE KITCHEN LOCATED AT APT 82, 8th STORY, 1st APARTMENT FROM SOUTH AT WESTApr 6, 2022
Mar 11, 2022CApt 82 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL ( APPROX 30 SQFT), AT NORTH WALL ( APPROX 30 SQFT) AND AT CEILING ( APPROX 20 SQFT) IN THE 3rd ROOM FROM NORTH LOCATED AT APT 82, 8th STORY, 1st APARTMENT FROM SOUTH AT WESTApr 6, 2022

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 4:46 AM ET. BBL 1012390023.

Look up another building