Manhattan · Block 1238 · Lot 46 · 10024

2450 Broadway

14 floors · 363 apartments · 214,011 sq ft · built 1923 · class D7 · owner of record: Broadway Greystone Llc

63open violations
$12,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 69 days
Annual
Annual boiler inspection (6 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-03-08 (Accepted). Agency page

Dec 31, 2026
in 69 days
6 of 6 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 85 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 214,011 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1238). Agency page

Dec 31, 2028
in 800 days
Next due 2028
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1165 days
Next cycle year 2029
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $854,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SAFE (2026-07-30)

Open violations

ECB / OATH (12) · $12,500 owed
IssuedViolationHearingBalance
Jan 5, 2024Construction CLASS - 1
UNLAWFUL ACTS.FAILURE TO COMPLY WITH THE COMMISSIONER ORDER.AS NOTED:AT THE TIME OF INSPECTION THERE WERE NO REPAIRS MADE TO THE DEFECTIVE HAZARDOUS CONDITIONS MENTIONED IN THE DOB SUMMON#091923SR0703NS EMERGEN
#35679605Y
Apr 11, 2024
IN VIOLATION
$0
Aug 15, 2023Construction CLASS - 2
OBSERVED IN BASEMENT IN THE LAUNDRY ROOM INSTALLED RESIDENTIAL FLEX HOSES ON COMMERCIAL GAS DRYERS. ALSO HAVING FUTURES ON GAS LINE WHICH CONTRARY FGC SECTION 404.15, REPAIR AND/OR REPLACE
#39092604P
Oct 19, 2023
ADMIT/IN-VIO
$0
Sep 19, 2022Elevators CLASS - 1
97X17:97-X-17=ENTIRE DEVICE INOPERATIVE. UPON INSPECTION THIS DEVICE IS FOUND TO BE OUT OF SERVICE FOR SEVERAL MONTHS CREATING A HAZARDOUS CONDITION FOR TENANTS AND EMS AS PER 1RCNY 1020.1. REMEDY:RESTORE DEVIC
#38274553P
May 11, 2023
IN VIOLATION
$3,125
Jun 13, 2022Elevators CLASS - 2
97X10: ELEVATOR NOT IN SERVICE; REPAIR (97.X.10)
#38274065X
Dec 15, 2022
STIPULATION/IN-VIO
$625
Dec 9, 2021Elevators CLASS - 1
FOUND ELEVATOR IS OUT OF SERVICE. RESTORE TO SERVICE.
#39052571L
Jan 27, 2022
IN VIOLATION
$625
Dec 7, 2021Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE/WALLS AND APPURTENANCES.NOTE:AT THE TIME OF THE INSPECTION OBSERVED AT EXPOSURE 1,NORTH ELEVATION:DAMAGED BALCONY(DECORATIVE)COVER WITH A NETT. DAMAGED DECORATIVE ST
#35635197J
Jul 14, 2022
IN VIOLATION
$1,250
Jun 1, 2021Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#803930. AGG1: PRIOR NOV#37013439J UNDER
#37021496X
Feb 24, 2022
IN VIOLATION
$3,125
Apr 23, 2021Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG FACADE OR APPURTENANCES. NOTE: AT TIME OF INSPECTION,OBSERVED AT 1)EXP#1(W 91 ST);BULGING DEFECTIVE STONE SECTIONS AT WINDOW HEAD STONES ON 14TH FL(I)CRACKED TERRA COTTA SECTIO
#35560012K
Jan 13, 2022
IN VIOLATION
$1,250
Apr 23, 2021Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. NOTE: AT TIME OF INSPECTION,OBSERVED THAT RESPONDENT DID NOT FILE A CERT OF CORRECTION FOR ECB#35265194Z DATED ON 3/19/2018
#35560013M
Jan 13, 2022
IN VIOLATION
$1,250
Apr 20, 2021Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG WALLS & APPURTENANCES. AS NOTED: AT TIME OF INSPECTION,I OBSERVED ON EXP#1,3,4 & ROOF: DEFECTIVE CONDITIONS SUCH AS CRACKS IN BRICKS & TERRA COTTA,DAMAGED,MORTAR JOINTS/SEALANT
#35559601K
Jan 13, 2022
IN VIOLATION
$1,250
Oct 15, 2018Local Law CLASS - 2
FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL# 803930. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT.
#37013439J
Mar 28, 2019
ADMIT/IN-VIO
$0
Mar 19, 2018Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BLDG(FACADE)& APPURTENCES AS NOTED: ROOF EXPOSURE SPALLED BRICK ON PARAPET WALLS INTERIOR & EXTERIOR CRACKS ON BULKHEAD DAMAGED (CALKING)JOINTS ON PARAPET WALLS CRACKS ON PARAPET WA
#35265194Z
Jul 12, 2018
IN VIOLATION
$0
DOB (17)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#03154
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#03155
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#03153
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#03156
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#03151
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#03152
DOB VIOLATION - ACTIVE
May 7, 2025FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
#00019
DOB VIOLATION - ACTIVE
Nov 18, 2024HAZARDOUS CONDITION (FACADE)
CYCLE 9B UNSAFE REPORT FILED
#911948
DOB VIOLATION - ACTIVE
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#01688
DOB VIOLATION - ACTIVE
Dec 1, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2100637
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#02106
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#02105
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#02104
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#02103
DOB VIOLATION - ACTIVE
Jun 13, 2018FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00067
DOB VIOLATION - ACTIVE
Aug 30, 2013NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
#00135
DOB VIOLATION - ACTIVE
Jul 31, 2008ELEVATOR

#9011/271399
DOB VIOLATION - ACTIVE
DOB NOW Safety (35)
IssuedViolationStatus
Mar 4, 2026Facades FTC-FC-UNSAFE
Unsafe report filed
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
May 7, 2025Facades FISPFCS
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
Active
Nov 18, 2024Facades FISPHAZ
CYCLE 9B UNSAFE REPORT FILED
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Dec 1, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
Sep 6, 2019Elevators ACC1
Active
Sep 6, 2019Elevators ACC1
Active
Sep 6, 2019Elevators ACC1
Active
Sep 6, 2019Elevators ACC1
Active
Jul 31, 2018Facades FISPNRF
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Active
Jun 13, 2018AEUHAZ FTC-AEU-HAZ
Active
Aug 30, 2013Facades FISPNRF
FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 12:23 AM ET. BBL 1012380046.

Look up another building