14 floors · 363 apartments · 214,011 sq ft · built 1923 · class D7 · owner of record: Broadway Greystone Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual boiler inspection (6 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-03-08 (Accepted). Agency page | Dec 31, 2026 in 69 days | 6 of 6 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 214,011 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1238). Agency page | Dec 31, 2028 in 800 days | Next due 2028 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $854,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2026-07-30) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 5, 2024 | Construction CLASS - 1 UNLAWFUL ACTS.FAILURE TO COMPLY WITH THE COMMISSIONER ORDER.AS NOTED:AT THE TIME OF INSPECTION THERE WERE NO REPAIRS MADE TO THE DEFECTIVE HAZARDOUS CONDITIONS MENTIONED IN THE DOB SUMMON#091923SR0703NS EMERGEN #35679605Y | Apr 11, 2024 IN VIOLATION | $0 |
| Aug 15, 2023 | Construction CLASS - 2 OBSERVED IN BASEMENT IN THE LAUNDRY ROOM INSTALLED RESIDENTIAL FLEX HOSES ON COMMERCIAL GAS DRYERS. ALSO HAVING FUTURES ON GAS LINE WHICH CONTRARY FGC SECTION 404.15, REPAIR AND/OR REPLACE #39092604P | Oct 19, 2023 ADMIT/IN-VIO | $0 |
| Sep 19, 2022 | Elevators CLASS - 1 97X17:97-X-17=ENTIRE DEVICE INOPERATIVE. UPON INSPECTION THIS DEVICE IS FOUND TO BE OUT OF SERVICE FOR SEVERAL MONTHS CREATING A HAZARDOUS CONDITION FOR TENANTS AND EMS AS PER 1RCNY 1020.1. REMEDY:RESTORE DEVIC #38274553P | May 11, 2023 IN VIOLATION | $3,125 |
| Jun 13, 2022 | Elevators CLASS - 2 97X10: ELEVATOR NOT IN SERVICE; REPAIR (97.X.10) #38274065X | Dec 15, 2022 STIPULATION/IN-VIO | $625 |
| Dec 9, 2021 | Elevators CLASS - 1 FOUND ELEVATOR IS OUT OF SERVICE. RESTORE TO SERVICE. #39052571L | Jan 27, 2022 IN VIOLATION | $625 |
| Dec 7, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE/WALLS AND APPURTENANCES.NOTE:AT THE TIME OF THE INSPECTION OBSERVED AT EXPOSURE 1,NORTH ELEVATION:DAMAGED BALCONY(DECORATIVE)COVER WITH A NETT. DAMAGED DECORATIVE ST #35635197J | Jul 14, 2022 IN VIOLATION | $1,250 |
| Jun 1, 2021 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#803930. AGG1: PRIOR NOV#37013439J UNDER #37021496X | Feb 24, 2022 IN VIOLATION | $3,125 |
| Apr 23, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDG FACADE OR APPURTENANCES. NOTE: AT TIME OF INSPECTION,OBSERVED AT 1)EXP#1(W 91 ST);BULGING DEFECTIVE STONE SECTIONS AT WINDOW HEAD STONES ON 14TH FL(I)CRACKED TERRA COTTA SECTIO #35560012K | Jan 13, 2022 IN VIOLATION | $1,250 |
| Apr 23, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. NOTE: AT TIME OF INSPECTION,OBSERVED THAT RESPONDENT DID NOT FILE A CERT OF CORRECTION FOR ECB#35265194Z DATED ON 3/19/2018 #35560013M | Jan 13, 2022 IN VIOLATION | $1,250 |
| Apr 20, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDG WALLS & APPURTENANCES. AS NOTED: AT TIME OF INSPECTION,I OBSERVED ON EXP#1,3,4 & ROOF: DEFECTIVE CONDITIONS SUCH AS CRACKS IN BRICKS & TERRA COTTA,DAMAGED,MORTAR JOINTS/SEALANT #35559601K | Jan 13, 2022 IN VIOLATION | $1,250 |
| Oct 15, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL# 803930. REMEDY: SUBMIT REQUIRED TECHNICAL REPORT. #37013439J | Mar 28, 2019 ADMIT/IN-VIO | $0 |
| Mar 19, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BLDG(FACADE)& APPURTENCES AS NOTED: ROOF EXPOSURE SPALLED BRICK ON PARAPET WALLS INTERIOR & EXTERIOR CRACKS ON BULKHEAD DAMAGED (CALKING)JOINTS ON PARAPET WALLS CRACKS ON PARAPET WA #35265194Z | Jul 12, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #03154 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #03155 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #03153 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #03156 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #03151 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #03152 | DOB VIOLATION - ACTIVE |
| May 7, 2025 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS #00019 | DOB VIOLATION - ACTIVE |
| Nov 18, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #911948 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01688 | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2100637 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #02106 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #02105 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #02104 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #02103 | DOB VIOLATION - ACTIVE |
| Jun 13, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00067 | DOB VIOLATION - ACTIVE |
| Aug 30, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 #00135 | DOB VIOLATION - ACTIVE |
| Jul 31, 2008 | ELEVATOR #9011/271399 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 4, 2026 | Facades FTC-FC-UNSAFE Unsafe report filed | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| May 7, 2025 | Facades FISPFCS CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Nov 18, 2024 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| Jun 13, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 30, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 12:23 AM ET. BBL 1012380046.