5 floors · 6 apartments · 9,695 sq ft · built 1910 · class C2 · owner of record: Rh 243 West 135 Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-30 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #04271 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 8, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT PUBLIC HALL, 1st STORY | Oct 22, 2026 |
| Oct 8, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL AT PUBLIC HALL, 5th STORY | Jan 11, 2027 |
| Oct 8, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND EAST WALL AT PUBLIC HALL, 5th STORY | Nov 12, 2026 |
| Oct 8, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF GAS POWERED SCOOTER AT PUBLIC HALL, 5th STORY | Nov 12, 2026 |
| Oct 8, 2026 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL AT PUBLIC HALL, 5th STORY | Nov 12, 2026 |
| Oct 1, 2026 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 5, 2026 |
| Oct 1, 2026 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 5, 2026 |
| Oct 1, 2026 | B | Apt 5A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 5, 2026 |
| Sep 28, 2026 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 2nd STORY | Nov 2, 2026 |
| Sep 28, 2026 | B | Apt 5A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER AND RETURN INTERCOM SYSTEM AT BUILDING FRONT TO PANEL AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 2, 2026 |
| Sep 28, 2026 | B | Apt 5A · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WATER CLOSET IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 2, 2026 |
| Sep 28, 2026 | A | Apt 5A · § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 1, 2027 |
| Sep 28, 2026 | A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CLEANSE THE FLOORS IN ALL PUBLIC HALLS | Jan 1, 2027 |
| Sep 28, 2026 | B | Apt 5A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 2, 2026 |
| Sep 10, 2026 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 15, 2026 |
| Sep 10, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND EAST WALL. AT PUBLIC HALL, 5th STORY | Oct 15, 2026 |
| Sep 10, 2026 | B | Apt 5A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 15, 2026 |
| Sep 10, 2026 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 15, 2026 |
| Sep 10, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING. AT PUBLIC HALL, 5th STORY | Oct 15, 2026 |
| Sep 10, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL AND CEILING AT PUBLIC HALL, 5th STORY | Dec 14, 2026 |
| Sep 10, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT BUILDING FRONT ENTRANCE DOOR , 1st STORY | Sep 24, 2026 |
| Sep 1, 2026 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WIRE MESH AT SKYLIGHT AT BULKHEAD TO ROOF | Oct 6, 2026 |
| Sep 1, 2026 | C | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GLASS PANE AT BULKHEAD SKYLIGHT | Sep 7, 2026 |
| Sep 1, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE TREADS, 1ST, 2ND, 3RD AND 5TH FROM THE BOTTOM. THE DAMAGE IS NOT AFFECTING EGRESS. AT PUBLIC HALL STAIRS, 1st STORY | Oct 6, 2026 |
| Sep 1, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HEAVY DUTY LOCK AT DOOR IN THE ENTRANCE TO BUILDING , 1st STORY | Sep 7, 2026 |
| Sep 1, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 5th STORY | Oct 6, 2026 |
| Sep 1, 2026 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND EAST WALL AT PUBLIC HALL, 5th STORY | Dec 5, 2026 |
| Sep 1, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL AT PUBLIC HALL, 5th STORY | Dec 5, 2026 |
| Sep 1, 2026 | B | Apt 5A · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 6, 2026 |
| Sep 1, 2026 | B | Apt 5A · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WATER CLOSET IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 6, 2026 |
| Sep 1, 2026 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL AT PUBLIC HALL, 5th STORY | Oct 6, 2026 |
| Aug 31, 2026 | B | Apt 5A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AND BUZZAR INTERCOM SYSTEM FROM THE BUILDING ENTRANCE TO THE EAST WALL PANEL IN THE FOYER LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 5, 2026 |
| Jul 20, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ASSEMBLIES AT BULKHEAD DOOR , 5th STORY | Aug 24, 2026 |
| Jul 20, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT BULKHEAD , 5th STORY | Aug 3, 2026 |
| Jul 20, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 10TH MARBLE TREAD, FROM BOTTOM UP AT BULKHEAD STAIRS , 5th STORY | Jul 26, 2026 |
| Jul 20, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ITS ASSEMBLIES AT BUILDING ENTRANCE DOOR , 1st STORY | Aug 24, 2026 |
| Jul 20, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT BUILDING ENTRANCE , 1st STORY | Aug 3, 2026 |
| Jun 8, 2026 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 13, 2026 |
| Jun 8, 2026 | B | § 27-2005 ADM CODE PROVIDE SECURITY IN THE EVENT OF A POWER OUTAGE BY MEANS OF AN ACCEPTABLE MECHANICAL HEAVY DUTY LOCK AND LATCH SET AT VESTIBULE DOOR , 1st STORY | Jul 13, 2026 |
| Jun 8, 2026 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT VESTIBULE DOOR , 1st STORY | Jun 14, 2026 |
| Jun 8, 2026 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 13, 2026 |
| Jun 8, 2026 | B | Apt 5A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 13, 2026 |
| Jun 8, 2026 | B | Apt 5A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL/BUZZER/INTERCOM SYSTEM FROM BUILDING ENTRANCE TO PANEL AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 13, 2026 |
| Apr 1, 2026 | B | Apt 5A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT THE CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 6, 2026 |
| Apr 1, 2026 | B | Apt 5A · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 6, 2026 |
| Apr 1, 2026 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 6, 2026 |
| Apr 1, 2026 | A | Apt 5A · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE GROUTED JOINTS WITH MILDEW AT NORTH WALL, SOUTH WALL, AND EAST WALL IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 5, 2026 |
| Apr 1, 2026 | B | Apt 5A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO RETURN PANEL AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 6, 2026 |
| Apr 1, 2026 | B | Apt 5A · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 6, 2026 |
| Apr 1, 2026 | B | Apt 5A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOORS AT BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 6, 2026 |
| Apr 1, 2026 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 6, 2026 |
| Apr 1, 2026 | B | Apt 5A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOORS AT WALL CABINET AT NORTH IN THE KITCHEN LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 6, 2026 |
| Apr 1, 2026 | B | Apt 5A · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 6, 2026 |
| Apr 1, 2026 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | May 6, 2026 |
| Aug 27, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT BUILDING FRONT ENTRANCE DOOR , 1st STORY | Oct 1, 2025 |
| Mar 14, 2025 | B | Apt 5A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 18, 2025 |
| Mar 14, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HEAVY DUTY LOCK AND LATCH SET AT BUILDING ENTRANCE DOOR | Apr 18, 2025 |
| Mar 14, 2025 | B | Apt 5A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 18, 2025 |
| Jun 13, 2018 | C | Apt 4A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 21, 2018 |
| Jan 29, 2018 | A | § 27-2049 ADM CODE POST AND MAINTAIN A STREET NUMBER ON THE FRONT OF THE DWELLING PLAINLY VISIBLE FROM THE SIDEWALK. | May 4, 2018 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT PUBLIC HALL, 1st STORY | Open |
| Oct 8, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL AT PUBLIC HALL, 5th STORY | Open |
| Oct 8, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND EAST WALL AT PUBLIC HALL, 5th STORY | Open |
| Oct 8, 2026 | HPD B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF GAS POWERED SCOOTER AT PUBLIC HALL, 5th STORY | Open |
| Oct 8, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL AT PUBLIC HALL, 5th STORY | Open |
| Oct 1, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Oct 1, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Oct 1, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 29, 2026 | HPD C | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT SINK IN THE KITCHEN LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Closed |
| Sep 28, 2026 | HPD B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 2nd STORY | Open |
| Sep 28, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER AND RETURN INTERCOM SYSTEM AT BUILDING FRONT TO PANEL AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 28, 2026 | HPD B | § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WATER CLOSET IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 28, 2026 | HPD A | § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 28, 2026 | HPD A | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CLEANSE THE FLOORS IN ALL PUBLIC HALLS | Open |
| Sep 28, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND EAST WALL. AT PUBLIC HALL, 5th STORY | Open |
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 10, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING. AT PUBLIC HALL, 5th STORY | Open |
| Sep 10, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL AND CEILING AT PUBLIC HALL, 5th STORY | Open |
| Sep 10, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT BUILDING FRONT ENTRANCE DOOR , 1st STORY | Open |
| Sep 1, 2026 | HPD B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WIRE MESH AT SKYLIGHT AT BULKHEAD TO ROOF | Open |
| Sep 1, 2026 | HPD C | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GLASS PANE AT BULKHEAD SKYLIGHT | Open |
| Sep 1, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE TREADS, 1ST, 2ND, 3RD AND 5TH FROM THE BOTTOM. THE DAMAGE IS NOT AFFECTING EGRESS. AT PUBLIC HALL STAIRS, 1st STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 1:18 PM ET. BBL 1019410007.