Manhattan · Block 426 · Lot 16 · 10002

243 Bowery

5 floors · 8,557 sq ft · built 1900 · class K4 · owner of record: Harlen Sales Co.,Inc.

7open violations
$6,562ECB/OATH penalties owed
0HPD class C (immediately hazardous)
802dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 71 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 802 days
Next cycle year 2028

Open violations

ECB / OATH (2) · $6,562 owed
IssuedViolationHearingBalance
Sep 17, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALLS/APPURTENANCES. AT TIME OF INSPECTION OBSERVED AT EXPOSURE #4 SEVERE CRACKS AND DETERIORATION TO CONCRETE STUCCO. LARGE SECTIONS HAVE DETACHED AND/OR MISSING. PENETRATIONS FURT
#39160716L
Jan 8, 2026
IN VIOLATION
$5,000
Dec 11, 2023Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED EXTERIOR STUCCO INSTATE OF DISREPAIR CONDITION WITH SPALLING, MISSING, CRACKS AND DETERIORATED ON EXPOSURE @ 02 & 03 IN VARIOUS LOCATIONS., REPAIR AND/OR REPLACE
#39101028H
Feb 15, 2024
DEFAULT
$1,562
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
HPD (5) · C 0 · B 3 · A 2
IssuedClassViolationCorrect by
Apr 29, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 2, 2026
Jan 9, 2019B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT SOUTH WALL AT PUBLIC HALL, 2nd STORYFeb 13, 2019
Jan 9, 2019A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL, 2nd STORYApr 14, 2019
Dec 13, 2006B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE AND OR MAKE HABITABLE FOR HUMANS ALL CUBICLES,BATHROOMS PER LODGING HOUSE RULES & REGULATIONS THRU-OUT , 3rd STORYJan 22, 2007
Jul 13, 2001B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE fire retard ceiling AT PUBLIC HALL, 4th STORYAug 22, 2001

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 21, 2026, 11:38 PM ET. BBL 1004260016.

Look up another building