Manhattan · Block 857 · Lot 76 · 10016

243 5 Avenue

24 floors · 258,639 sq ft · built 1927 · class O4 · owner of record: 245 Fifth Owner Llc

27open violations
$22,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
188dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 258,639 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 188 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 188 days
Annual filing
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 857). Agency page

Dec 31, 2027
in 432 days
Next due 2027
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1163 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-23 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $290,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: UNSAFE (2026-09-18)

Open violations

ECB / OATH (11) · $22,500 owed
IssuedViolationHearingBalance
Sep 2, 2026Cranes and Derricks CLASS - 2
26 STORY ALT2 FACADE WORK ACTIVE SITE.UPON REQUEST TO RIGGER ONSITE FOR CHOOK & OUTRIGGER NOTIFICATION TO THE DEPARTMENT FOR SUSPENDED SCAFFOLDS & CHOOKS INSTALLED/IN USE EX#1,2 NONE PROVIDED PER DOB NOW/BIS &
#39558692X
Nov 12, 2026
PENDING
$2,500
Sep 2, 2026Construction CLASS - 2
26 STORY FACADE ALT2 ACTIVE SITE.OBSERVED C HOOKS INSTALLED ON BALCONY/SETBACK AT EXP1,2 CORNER ATTACHED TO PLATFORM READILY AVAILABLE FOR USE.UPON REQUEST TO RIGGER ONSITE FOR DESIGN DRAWINGS STAMPED BY ENGINE
#39558694J
Nov 12, 2026
PENDING
$1,250
Sep 2, 2026Construction CLASS - 2
26 STORY ALT2 FACADE WORK ACTIVE SITE. WORK CONTRARY TO APPROVED OUTRIGGER PLANS ONSITE. OBSERVED SUSPENDED SCAFFOLD IN PLACE/USE EXP#1,2, INSTALLED CONTRARY TO PLANS. NO DETAILS FOR 6' MASONRY FRAMES 40', SCAF
#39558693H
Nov 12, 2026
PENDING
$1,250
Sep 2, 2026Construction CLASS - 2
26 STORY FACADE ALTERATION ACTIVE SITE. OBSERVED SUSPENDED SCAFFOLDS/TEMPORARY EQUIPMENT IN PLACE WITH MASONRY FRAMES UNDERNEATH & WIRE ROPES CONNECTED WITH 20 FEET OF LEADING EDGE MORE THAN 4" ABOVE ADJOINING
#39558690M
Nov 12, 2026
PENDING
$1,250
Sep 2, 2026Unknown CLASS - 2
26 STORY COMMERCIAL BUILDING ALT2 FACADE WORK ACTIVE SITE. FAILURE TO PROVIDE/PROTECT OCCUPANTS/COMPLY WITH REQUIRED OCCUPANT PROTECTION PLAN (OPP).NO OPP ONSITE OBSERVED PUBLIC/PERSONS ON BALCONIES ON 22 FL &
#39558691Y
Nov 12, 2026
PENDING
$2,500
Jun 17, 2024Construction CLASS - 2
AC27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTEREED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HEIGHT IN E
#37028809J
Jul 31, 2025
IN VIOLATION
$6,250
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #902396. REMEDY: SUBMIT ACCEPTABLE REQU
#37027659Z
Mar 20, 2025
IN VIOLATION
$1,250
Feb 28, 2023Construction CLASS - 2
27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGNPROFESSIONAL IN OFFICE BLDG 100 FT OR MORE IN HEIGHT IN EXISTENCE ON
#37025260H
Jun 22, 2023
IN VIOLATION
$6,250
Mar 30, 2021Construction CLASS - 2
27-929.1 AC27-929.1,FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OFAUTOMATIC SPRINKLERS&FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100' OR MORE IN HT IN EXISTENCE O
#37020737N
Oct 14, 2021
IN VIOLATION
$0
Jul 13, 2020Construction CLASS - 2
27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BUILDING 100 FEE
#37019791X
Feb 25, 2021
IN VIOLATION
$0
Nov 15, 2019Construction CLASS - 2
SEC. A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDG 100 FEET
#37016344K
Feb 13, 2020
STIPULATION/IN-VIO
$0
DOB (3)
IssuedViolationStatus
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#06912
DOB VIOLATION - ACTIVE
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#01354
DOB VIOLATION - ACTIVE
Sep 3, 2019SPRINKLER
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
#NRF00205
DOB VIOLATION - ACTIVE
DOB NOW Safety (13)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Sep 3, 2019Sprinklers FTF-SP-FINAL
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 21, 2026DOB SafetyFacades: Unsafe FISP report filedClosed
Sep 2, 2026ECBCranes and Derricks: 26 STORY ALT2 FACADE WORK ACTIVE SITE.UPON REQUEST TO RIGGER ONSITE FOR CHOOK & OUTRIGGER NOTIFICATION TO THE DEPARTMENT FOR SUSPENDED SCAFFOLDS & CHOOKS INSTALLED/IN USE EX#1,2 NONE PROVIDED PER DOB NOW/BIS &Open
Sep 2, 2026ECBConstruction: 26 STORY FACADE ALT2 ACTIVE SITE.OBSERVED C HOOKS INSTALLED ON BALCONY/SETBACK AT EXP1,2 CORNER ATTACHED TO PLATFORM READILY AVAILABLE FOR USE.UPON REQUEST TO RIGGER ONSITE FOR DESIGN DRAWINGS STAMPED BY ENGINEOpen
Sep 2, 2026ECBConstruction: 26 STORY ALT2 FACADE WORK ACTIVE SITE. WORK CONTRARY TO APPROVED OUTRIGGER PLANS ONSITE. OBSERVED SUSPENDED SCAFFOLD IN PLACE/USE EXP#1,2, INSTALLED CONTRARY TO PLANS. NO DETAILS FOR 6' MASONRY FRAMES 40', SCAFOpen
Sep 2, 2026ECBConstruction: 26 STORY FACADE ALTERATION ACTIVE SITE. OBSERVED SUSPENDED SCAFFOLDS/TEMPORARY EQUIPMENT IN PLACE WITH MASONRY FRAMES UNDERNEATH & WIRE ROPES CONNECTED WITH 20 FEET OF LEADING EDGE MORE THAN 4" ABOVE ADJOININGOpen
Sep 2, 2026ECBUnknown: 26 STORY COMMERCIAL BUILDING ALT2 FACADE WORK ACTIVE SITE. FAILURE TO PROVIDE/PROTECT OCCUPANTS/COMPLY WITH REQUIRED OCCUPANT PROTECTION PLAN (OPP).NO OPP ONSITE OBSERVED PUBLIC/PERSONS ON BALCONIES ON 22 FL &Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 2:41 PM ET. BBL 1008570076.

Look up another building