4 floors · 26,255 sq ft · built 1937 · class Y2 · owner of record: Nyc Police Department
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 26,255 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 166 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 166 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 776 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-12 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 2, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER I OBSERVED ON THE FIRST FLOOR WATER FOUNTAIN WASTE LINE IS CLOGGED, REPAIR AND/OR REPLACE #39057286P | Mar 7, 2022 POP/IN-VIO | $0 |
| May 4, 2009 | Construction CLASS - 3 OCCUPANCY CONTRARY TO THAT ALLOWED BY CERT OF OCCUP. AT THE 3RD FL THECLASS "B" UNITS HAVE BEEN COMBINED TO CREATE ONE CLASS "A" UNIT CONTRARY TO C OF O # 77037. REMEDY: DISCONTINUE ILLEGAL USE OR AMEND C OF O. #34775295L | Jan 14, 2010 IN VIOLATION | $0 |
| Sep 24, 2007 | Construction Non-Hazardous FAILURE TO MAINTAIN BLDG INTERIOR:DEFECTS NOTED.SUSPENDED CEILING IN COMPLAINT ROOM ON FIRST FLOOR HAS MULTIPLE WATER STAINS AND AN EIGHT INCH SQUARE HOLE CURRENTLY PATCHED W/MANILA FOLDER MATERIAL.FIRE RATED #34593912K | Nov 15, 2007 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #04270 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #03064 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 9:19 PM ET. BBL 1019400048.