4 floors · 2 apartments · 3,200 sq ft · built 1868 · class S9 · owner of record: Adg 242 Realty Co Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 303 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1155 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-22 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 2, 2023 | Construction CLASS - 3 OBSERVED AT REAR YARD HAVING ERECTED AN APPROX. 20'LX20'WX10'H CANOPY STRUCTURE ON TOP OF AN ILLEGAL WOODEN DECK. CONSTRUCTED OF WOOD FRAMING WITH PLASTIC ROOFING PANELS, SUPPORTED ON WOODEN POSTS. STRUCTURE EX #39087678L | Sep 6, 2023 IN VIOLATION | $0 |
| May 15, 2009 | Construction CLASS - 2 EXIT DOOR NOT SELF CLOSING. REAR EXIT DOOR AT REAR OF BAR (OLBLA) ALIBI NOT SELF CLOSING. REMEDY: REPAIR AND/OR REPLACE DOOR. #34755295N | Aug 2, 2010 IN VIOLATION | $0 |
| Feb 26, 2005 | Construction Hazardous EXIT DOOR NOT SELF CLOSING NOTED: DOOR AT REAR OF BAR NOT SELF CLOSINGREMEDY:REPAIR OR REPLACE EXIT DOOR. #34470876M | Apr 18, 2005 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #13850 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #17346 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #22704 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #26738 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 12:34 AM ET. BBL 3021050031.