2 floors · 2,479 sq ft · built 1925 · class M1 · owner of record: Otzar Hatorah Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 433 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 17, 2026 | Construction CLASS - 1 VIOLATION ISSUED FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER .ATOI OBSERVED ON THE 1ST FL AND BASEMENT IMPROPER STORAGE OF GAS CANS AND PROPANE CANISTER NEXT TO COMBUSTIBLE MATERIALS WHILE ON GOIN #39177534L | Nov 17, 2026 PENDING | $2,500 |
| Feb 17, 2026 | Unknown CLASS - 1 WORK WITHOUT PERMIT: FSWO ISSUED FOR ALL ELECTRICAL WORK BEING DONE ON THE INTERIOR OF THE HOUSE OF WORDSHIP. ATOI AT 1PM OBSERVED IN THE INTERIOR OF THE HOUSE OF WORDSHIP AT STREET AND BASEMENT LEVEL NEWLY INS #39177533J | Nov 17, 2026 PENDING | $2,500 |
| Feb 17, 2026 | Construction CLASS - 1 WORK WITHOUT PERMIT. FSWO ISSUED FOR ALL GENERAL CONSTRUCTION. EXCAVATION, MASONRY, CARPENTRY AND STRUCTURAL WORK BEING DONE. ATOI OBSERVED ON THE 1ST FL AND BASEMENT OF THE HOUSE OF WORSHIP NEWLY INSTALLED PAR #39177536P | Nov 17, 2026 PENDING | $2,500 |
| Feb 17, 2026 | Construction CLASS - 1 WORK WITHOUT PERMIT: FSWO ISSUED FOR ALL PLUMBING WORK BEING DONE ON THE INTERIOR OF THE HOUSE OF WORDSHIP. ATOI OBSERVED IN THE INTERIOR OF THE HOUSE OF WORDSHIP AT THE FIRST FLOOR STREET LEVEL NEWLY INSTALLED #39177535N | Nov 17, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Feb 18, 2026 | IMMEDIATE EMERGENCY INSTALL APPROX 90 TOTAL LINEAR FT (8FT IN HEIGHT) OF TEMPORARY CONSTRUCTION FENCE PROTECTION TO ENCLOSE HAZARDOUS SITE IMMEDIATELY AS PER CODE (BC 3307.7) -APPROX 35 LINEAR FT AT REAR YARD EXPOSURE-2 -APPROX 20 LINEAR FT AT REAR YARD EXPOSURE-3 -APPROX 35 LINEAR FT AT REAR YARD EXPOSURE-4 #20007 | DOB VIOLATION - ACTIVE |
| Feb 17, 2026 | CONSTRUCTION NOTED: ATOI OBSERVED IN THE BASEMENT OF THE HOUSE OF WORDSHIP EXCAVATION IN MULTIPLE LOCATIONS ALONG ITS WALLS WITH UNDER PINNING'S #26-00527 | DOB VIOLATION - ACTIVE |
| Feb 17, 2026 | CONSTRUCTION FULL VACATE ORDER ISSUED FOR THE ENTIRE BUILDING: ATOI OBSERVED IN THE BASEMENT OF THE HOUSE OF WORDSHIP MULTIPLE UNPERMITTED EXCAVATIONS ALONG ITS WALL WITH UNDER PINING'S WHICH IS A HAZZARD AND HAS COMPROMISED THE ENTIRE BUILDING #26-00530 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #14093 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #12872 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #31423 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #11005 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #31696 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #09817 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #18438 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 15) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 3:56 AM ET. BBL 3073290051.