2 floors · 4,000 sq ft · built 1920 · class K2 · owner of record: K.J.J.J Realty Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 1, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 39142260N, FILE A CERTIFICATE OF CORRECTION #39190585H | Aug 12, 2026 DEFAULT | $6,250 |
| Apr 7, 2025 | Construction CLASS - 1 OBSERVED AT TIME OF INSPECTION THAT STOP WORK ORDER POSTED ON 03/20/2025 AT FRONT OF BUILDING WAS REMOVED AND WAS NOT REPLACE IN ANY VISUAL LOCATION.( REPOSTED # OP-71-25-0075 SWO), COMPLY WITH CODE #39144089L | Sep 5, 2025 IN VIOLATION | $5,000 |
| Mar 20, 2025 | Construction CLASS - 2 OBSERVED NEW PLUMBING WORK DONE THROUGHOUT THE BUILDING(STORE). INSTALLED NEW COPPER FITTINGS ALONG WITH CUT OFF VALVES. NO PLUMBING PERMIT FOR THIS WORK AT THE TIME OF INSPECTION., OBTAIN ALL PERMITS #39142261P | May 28, 2025 ADMIT/IN-VIO | $0 |
| Mar 20, 2025 | Unknown CLASS - 1 OBSERVED NEW ELECTRICAL WORK DONE THROUGHOUT THE BUILDING(STORE). INSTALLED NEW SWITCHES, OUTLETS AND JUNCTION BOXES WITH THE BX CABLES. NO ELECTRICAL PERMIT FOR THIS WORK AT THE TIME OF INSPECTION., OBTAIN PER #39142260N | May 28, 2025 DEFAULT | $8,000 |
| Issued | Violation | Status |
|---|---|---|
| May 16, 2019 | CONSTRUCTION #CN0811RA | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 5:31 PM ET. BBL 3013850010.