4.25 floors · 4 apartments · 4,976 sq ft · built 2025 · class C3 · owner of record: 241 13th Street Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 13, 2026 | Construction CLASS - 2 @ TIME OF INSPECTION, THE FOLLOWING REQUIRED DOCUMENTATION WERE NOT AVAILABLE ON SITE FOR REVIEW SUCH AS NO SSP, SWS DRAWINGS, PIPE SCAFFOLD DRAWINGS, REQUIRED COMPLETION LETTER FOR PIPE SCAFFOLD, NO INSPECTION #39557900R | Oct 21, 2026 | $1,250 |
| May 14, 2026 | Unknown CLASS - 2 3309.10, 3309.13, 3308.7. SITE ISCURRENTLY UP TO 3RD FLOOR. OBSERVED A STEAL BEAM INSTALLED LONG THE EDGE OF EXPO#2 AND CMU WORK WAS INSTALLED. THE ADJOINING BUILDING HAS NO ROOF PROTECTION INSTALLED AT TIME OF #39554156Y | Feb 9, 2027 | $2,500 |
| Apr 7, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE INSTALLED AT EXP1, UPON RESEARCHING DOB RECORDS PERMIT B00862160 EXPIRED 08/2025. NO ADDITIONAL FENCE PERMIT ON RECORD #39552722K | Aug 5, 2026 IN VIOLATION | $0 |
| Mar 23, 2026 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIP OR/INSTALLATION ONSITE EXPIRED PERMIT.AS NOTED:AT TIME OF INSPECTION CONSTRUCTION SITE OF A PROPOSED 4 STORY BUILDING WAS CLOSED.OBSERVED CONSTRUCTION PLYWOOD FENCE PERMIT HAD EXPIR #35726452L | Jun 2, 2026 DEFAULT | $6,250 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 13, 2026 | ECB | Construction: @ TIME OF INSPECTION, THE FOLLOWING REQUIRED DOCUMENTATION WERE NOT AVAILABLE ON SITE FOR REVIEW SUCH AS NO SSP, SWS DRAWINGS, PIPE SCAFFOLD DRAWINGS, REQUIRED COMPLETION LETTER FOR PIPE SCAFFOLD, NO INSPECTION | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 7:06 PM ET. BBL 3010280058.