3 floors · 11 apartments · 2,561 sq ft · built 1910 · class C5 · owner of record: One 32 St Concept Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 5, 2026 | Construction CLASS - 1 ATOI, OBSERVED THAT STOP WORK ORDER STICKER HAS BEEN REMOVED., COMPLY WITH CODE #39199330R | Oct 15, 2026 DEFAULT | $5,030 |
| Aug 1, 2026 | Construction CLASS - 1 NOTED IN A VACATE BUILDING LEGAL VACATE STICKER HAD BEEN REMOVED. BUILDING WAS VACATED UNDER COMP# 1471344, COMPLY WITH CODE; RESTORE VACATE ORDER #39198741R | Jan 14, 2027 PENDING | $5,000 |
| Aug 1, 2026 | Construction CLASS - 1 OBSERVED 2 WORKERS ILLEGALLY IN BUILDING CONTRARY TO A FULL VACATE ORDER. WORKERS HAD BEEN PREFORMING WORK SINCE 7-17-26 AS NOTED IN COMP. #1471344. BUILDING WAS DEEMED UNSAFE AND NO CORRECTION HAS BEEN SUBMITT #39198740P | Jan 14, 2027 PENDING | $10,000 |
| Aug 1, 2026 | Construction CLASS - 1 NOTED 2 WORKERS CONDUCTING FRAMING AND STRUCTURE WORK AGAINST A STOP WORK ORDER ISSUED UNDER COMP #1731068. NO PERMIT WAS FILED FOR STRUCTURAL WORK. BUILDING IS DEEMED UNSAFE AND WAS VACATED 2-1-18 DUE TO COLLA #39198739H | Jan 14, 2027 PENDING | $10,000 |
| Jul 30, 2026 | Construction CLASS - 1 TAMPERED WITH REMOVED OR DEFACED A WRITTEN STOP WORK ORDER. OBSERVED REMOVAL OF THE STOP WORK ORDER THAT WAS PEELED OFF THE WINDOW. PSWO WAS POSTED AT PREMISES ON 07/17/2026 UNDER COMPLAINT # 1731068. NO RECISS #39198553J | Jan 14, 2027 PENDING | $5,000 |
| Jul 17, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION, PLUMBING WORK WAS OBSERVED IN THE BASEMENT THAT APPEARED TO BE RELATED TO DRAINAGE. PVC PIPES WITH AN APPROXIMATE 10-INCH DIAMETER WERE BEING INSTALLED ALONG THE WALL AND ROUTED TOWAR #39196646J | Dec 3, 2026 PENDING | $2,500 |
| Jul 17, 2026 | Construction CLASS - 1 ATOI, WWOP: OBSERVE ALTERATION WORK BEING DONE INSIDE THE BASEMENT WALL LEADING TO EXPO 3 FACADE, OBSERVE A 5X5 FEET HOLE WITH FRAMING WORK DONE FOR THE PLUMBING WORK BEING INSTALLED. WORK APPEARS TO BE 60% DON #39196647L | Dec 3, 2026 PENDING | $2,500 |
| Jan 12, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED EXPOSURE 1FACADE IN DISREPAIR(CRACKED FACADE STUCCO,FRONT ENTRANCE ORNAMENT CEMENT COLUMN CRACKED,BROKEN PIECES OF CEMENT).REM:REPAIR OR REPLACE. #35546240L | Apr 1, 2021 DEFAULT | $3,125 |
| Nov 2, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.NOTED:FACADE EXPOSURE #1 IN STATE OF DISREPAIR(CRACKED FACADE,STUCCO,BROKEN PIECE OF CEMENT. REMEDY: REPLACE OR REPAIR. #35542879Y | Jan 14, 2021 DEFAULT | $6,250 |
| Sep 4, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER NOTED AT TIME OF MY INSPECTION I OBSERVED AT EXPOSURE #1 AT FRONT FACADE FROM THE 1ST FLOOR TO PHOTO WAS TAKEN BUILDING IN SERIOUS STATE OF DISREPAIR NEED T #35500875L | Nov 12, 2020 DEFAULT | $12,500 |
| Feb 8, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER NOTED AT TIM EOF INSPECTION I OBSERVED AT THE FRONT FACADE AT EXPOSURE #1 BUILD PARTIALLY BOARDED UP WITH DETERIORATING MASONRY THROUGHOUT FACADE OR FROM TH #35468015Y | Jan 14, 2021 DEFAULT | $12,500 |
| Dec 26, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION I OBSERVED AT FACADE AT EXP#1 BLDG PARTIALLY BOARDED UP W/DETERIORATING MASONRY THROUGHOUT FACADE OR FRM THE 1ST FL,PHOTO WAS TAKE #35461366Y | Mar 5, 2020 DEFAULT | $12,500 |
| Nov 9, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35454849N ISSUED ON 10-07-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. REMEDY: COMP #35428524X | Jan 16, 2020 DEFAULT | $5,000 |
| Oct 7, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED:AT TIME OF INSPECTION I OBSERVED AT FACADE AT EXPOSURE#1 BUILDING PARTIALLY BOARDED UP W/ DETERIORATING MASONRY THROUGHOUT FACADE ON FROM THE 1ST FL #35454849N | Dec 12, 2019 DEFAULT | $12,500 |
| Aug 8, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED:AT FACADEEXPOSURE#1 BUILDING PARTIALLY BOARDED UP W/ DETERIORATING MASONRY THROUGHOUT FACADE FLOORS 1-5 CRACKED,DAMAGED MASONRY WINDOW SILLS THROUGHO #35442485N | Oct 10, 2019 DEFAULT | $12,500 |
| May 29, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT TIME OFINSPECTION I OBSERVED AT FRONT ENTRY DOOR CLASS PANEL BROKEN AND NO PROTECTION TO SAFE THE PUBLIC ALSO AT EXPOSURE #1 THE FACADE IS STATE OF #35434131X | Aug 1, 2019 DEFAULT | $12,500 |
| Mar 14, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION OBSERVED THE ENTRY DOOR GLASS PANEL BROKEN & NO PROTECTION TO SAFE THE PUBLIC. REMEDY: REPAIR &/REPLACE. #35250577Y | May 16, 2019 DEFAULT | $6,250 |
| Jul 28, 2018 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35309011Z ISSUED ON 02-01-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35386659K | Oct 4, 2018 DEFAULT | $3,125 |
| Feb 1, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT THE TIME OF MY INSPECTION AT THE ABOVE ADDRESS ON THE ABOVE DATE I OBSERVED THAT THE INTERIOR OF THIS HOME HAD COLLAPSED AND HAS NOT BEEN FIXED OR MAINTA #35309011Z | Mar 22, 2018 WRITTEN OFF | $0 |
| Feb 23, 2012 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS OR APPURTENANCES. DEFECTS NOTED: AT TIME OF INSPECTION THERE IS SPALLING/CRACKED BROWNSTONE FACADE AT EXPOSURE #1 FRONT OF BUILDING BROKEN WINDOW ALSO OBSERVED AT 3 #34938129J | Apr 19, 2012 WRITTEN OFF | $0 |
| Dec 15, 2010 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/ THE DOB. NOTED: RESPONDENT FAILED TO CORRECT THE VIOLATING CONDITIONS AND FILE A CERT. OF CORRECTION, PURSUANT TO 28-204.2, FOR NOV #348339 #34893196N | Feb 3, 2011 WRITTEN OFF | $0 |
| Aug 11, 2010 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. REAR EXP 3 - TWO LAYERS OF VERTICAL BRICK SEPARATING FROM PARTY WALL AT 2ND AND 3RD FLR. REMEDY: OBTAIN PERMITS, REPAIR/REPLACE ACCORDING TO CODE. #34833978N | Oct 21, 2010 WRITTEN OFF | $0 |
| Jun 16, 2010 | Boilers CLASS - 3 50A REMOVE OR LEGALIZE ABOVE GRAND FUEL OIL STORAGE TANK #32068548P | Aug 5, 2010 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #04248 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #04163 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #42794 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #21900 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #23952 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #40090 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #07542 | DOB VIOLATION - ACTIVE |
| Feb 3, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00085 | DOB VIOLATION - ACTIVE |
| Nov 25, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00144 | DOB VIOLATION - ACTIVE |
| Sep 2, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #01134 | DOB VIOLATION - ACTIVE |
| Sep 2, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #01133 | DOB VIOLATION - ACTIVE |
| Jan 17, 2020 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #00667 | DOB VIOLATION - ACTIVE |
| Jan 9, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00132 | DOB VIOLATION - ACTIVE |
| Oct 30, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00123 | DOB VIOLATION - ACTIVE |
| Aug 22, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00121 | DOB VIOLATION - ACTIVE |
| Jun 26, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00285 | DOB VIOLATION - ACTIVE |
| Jul 25, 2018 | UNSAFE BUILDINGS #1003/18 | DOB VIOLATION - ACTIVE |
| May 2, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00093 | DOB VIOLATION - ACTIVE |
| Mar 12, 2018 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONER ORDER #333807 ISSUED ON 2/1/18 TO REPAIR/DEMO THE STRUCTURALLY COMPROMISED BUILDING UNDER PERMIT NO LATER THAN 3/5/18.NO PERMITS HAVE BEEN OBTAINED FOR REMEDIAL WORK AS OF 3/12/18.REMEDY:COMPLY WITH COMMISSIONER ORDER #333807 IMMED #FEU11001FF | DOB VIOLATION - ACTIVE |
| Feb 1, 2018 | CONSTRUCTION FTM BLDG.BLDG IS 3 STRY+BSMT+CELLAR IN DISREPAIR.1STFL JOISTS HAS PART COLL INSIDE BLDG&PART COLL DEBRIS IS RESTING ON BSMT WOOD JOISTS FLRS OVER LOADING IT.SIDE WALLS NOT PROP BRACED LEAVING BLDG STRL COMPROM REMEDY:OWN ENGAGE NYS PROF ENG EVAL BLDG&PREP RPR WRK OR DEMO PLANS PERM FOR WRK BE OBTAIN #FEU11001FF | DOB VIOLATION - ACTIVE |
| Dec 2, 2010 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00370 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #06440 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #06283 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #06614 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #06255 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #06960 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #07262 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #06936 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #07140 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #09357 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 25, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 25, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 9, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 9, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 31, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 31, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Feb 3, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 25, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 2, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 2, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 17, 2020 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Jan 9, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 22, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 26, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| May 2, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 2, 2010 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 29, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 2, 2026 |
| Jun 4, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 7, 2025 |
| Apr 2, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 6, 2024 |
| Mar 16, 2023 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jun 19, 2023 |
| Jul 11, 2011 | B | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING ,100 WATTS REQUIRED. | Aug 15, 2011 |
| Jun 26, 2008 | A | D26-10.01 ADM CODE PROVIDE PEEPHOLES IN ENTRANCE DOOR TO EACH HOUSING UNIT WHERE NOT ALREADY PROVIDED. | Sep 29, 2008 |
| Jun 26, 2008 | B | SECTION 65 M/D LAW PROVIDE UNDER COMPLETED PERMIT, A PROPER ENCLOSURE FOR THE CENTRAL HEATING PLANT, AT CELLAR. | Jul 31, 2008 |
| Jun 26, 2008 | A | D26-31.09 ADM CODE PROVIDE AT LEAST ONE WATER CLOSET ON THE SAME FLOOR FOR THE ROOMS USED FOR CLASS B OCCUPANCY. WORK MUST BE COMPLETED UNDER PERMIT AT 3 STY. | Sep 29, 2008 |
| Jun 26, 2008 | A | D26-31.09 ADM CODE PROVIDE UNDER COMPLETED PERMIT SANITARY FACILITIES FOR EACH 6 PERSONS OR REMAINDER THEREOF FOR CLASS B ROOMS BY INSTALLING 1 WASH BASINS & 1 BATHTUB OR SHOWER. | Sep 29, 2008 |
| Jun 26, 2008 | A | SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION BATHTUB WASH BASIN INSTALLED IN KITCHEN OF BASEMENT & 1 STY APT. | Sep 29, 2008 |
| Nov 29, 2005 | B | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS REQUIRED | Jan 8, 2006 |
| Apr 6, 1999 | B | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS MINIMUM. | May 24, 1999 |
| Dec 4, 1990 | B | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING NIGHT INSPECTION LIGHT FIXTURE PRESENT NOT ON. | Jan 21, 1991 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 25, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 25, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 9, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 9, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 31, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 31, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 5, 2026 | ECB | Construction: ATOI, OBSERVED THAT STOP WORK ORDER STICKER HAS BEEN REMOVED., COMPLY WITH CODE | Open |
| Aug 1, 2026 | ECB | Construction: NOTED IN A VACATE BUILDING LEGAL VACATE STICKER HAD BEEN REMOVED. BUILDING WAS VACATED UNDER COMP# 1471344, COMPLY WITH CODE; RESTORE VACATE ORDER | Open |
| Aug 1, 2026 | ECB | Construction: OBSERVED 2 WORKERS ILLEGALLY IN BUILDING CONTRARY TO A FULL VACATE ORDER. WORKERS HAD BEEN PREFORMING WORK SINCE 7-17-26 AS NOTED IN COMP. #1471344. BUILDING WAS DEEMED UNSAFE AND NO CORRECTION HAS BEEN SUBMITT | Open |
| Aug 1, 2026 | ECB | Construction: NOTED 2 WORKERS CONDUCTING FRAMING AND STRUCTURE WORK AGAINST A STOP WORK ORDER ISSUED UNDER COMP #1731068. NO PERMIT WAS FILED FOR STRUCTURAL WORK. BUILDING IS DEEMED UNSAFE AND WAS VACATED 2-1-18 DUE TO COLLA | Open |
| Jul 30, 2026 | ECB | Construction: TAMPERED WITH REMOVED OR DEFACED A WRITTEN STOP WORK ORDER. OBSERVED REMOVAL OF THE STOP WORK ORDER THAT WAS PEELED OFF THE WINDOW. PSWO WAS POSTED AT PREMISES ON 07/17/2026 UNDER COMPLAINT # 1731068. NO RECISS | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 7:13 AM ET. BBL 1019370048.