Manhattan · Block 1433 · Lot 31 · 10075

240 East 79 Street

16 floors · 64 apartments · 63,488 sq ft · built 1929 · class D4 · owner of record: 240 79 Owners Corp

15open violations
$1,250ECB/OATH penalties owed
1HPD class C (immediately hazardous)
44dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 44 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 63,488 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1433). Agency page

Dec 31, 2033
in 2601 days
Next due 2033
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-07 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $709,500 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SWARMP (2025-05-29)

Open violations

ECB / OATH (3) · $1,250 owed
IssuedViolationHearingBalance
Jul 8, 2026Construction CLASS - 2
: FAILURE TO MAINTAIN. OBSERVED TERRACE IN APT. PHA. INTERIOR WATER DAMAGE TO WOOD AND FLOOR TILE , EFFECTING APPROX. 2FT OF FLOORING. EXTERIOR WATER DAMAGE TO BASE OF SLIDING DOOR, CHIPPING AND CRACKS TO EXTER
#39195152P
May 6, 2027
PENDING
$1,250
Apr 8, 2025Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C AND 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #905222. REMEDY: SUBMIT ACCEPTAB
#37034655R
Jul 3, 2025
ADMIT/IN-VIO
$0
Feb 13, 2020Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #805222.REM:SUBMIT ACCEPTABLE REQUIRED TECHNICAL REP
#37018314Z
May 28, 2020
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
Jun 23, 2024FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
#10076
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01316
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jun 23, 2024Retro-Commissioning - LL87 FTF-EN-EARCX
Active
HPD (9) · C 1 · B 7 · A 1
IssuedClassViolationCorrect by
Sep 8, 2026BApt PHA · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN TEN SQ FT AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT PHA, 17th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 18874522 ISSUED 06-MAY-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRAOct 13, 2026
May 13, 2026BApt PHA · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT UPPER WINDOW SASH GLASS AT SOUTH WALL IN THE KITCHEN LOCATED AT APT PHA, 17th STORY, 1st APARTMENT FROM WEST AT NORTHJun 17, 2026
May 13, 2026AApt PHA · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT PHA, 17th STORY, 1st APARTMENT FROM WEST AT NORTHAug 16, 2026
May 8, 2026BApt PHA · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LATCH SET AT NORTH WALL LEADING TO ROOF IN THE 2nd ROOM FROM EAST LOCATED AT APT PHA, 17th STORY, 1st APARTMENT FROM WEST AT NORTHJun 12, 2026
May 8, 2026CApt PHA · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT PHA, 17th STORY, 1st APARTMENT FROM WEST AT NORTHMay 22, 2026
May 8, 2026BApt PHA · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT PHA, 17th STORY, 1st APARTMENT FROM WEST AT NORTHJun 12, 2026
May 8, 2026BApt PHA · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT PHA, 17th STORY, 1st APARTMENT FROM WEST AT NORTHJun 12, 2026
May 8, 2026BApt PHA · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT PHA, 17th STORY, 1st APARTMENT FROM WEST AT NORTHJun 12, 2026
Mar 24, 2026BApt PHA · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT PHA, 17th STORY, 1st APARTMENT FROM EAST AT SOUTHApr 28, 2026

Issued in the last 120 days

DateSourceWhatNow
Sep 8, 2026HPD B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN TEN SQ FT AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT PHA, 17th STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 18874522 ISSUED 06-MAY-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRAOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 8:56 AM ET. BBL 1014330031.

Look up another building