4 floors · 16 apartments · 11,800 sq ft · built 1928 · class C1 · owner of record: 32 Dm Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-18 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 21, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION, OBSERVED INSTALLED SHED MISSING CROSS BAR FROM BACK TO FRONT POST AND ADDITIONAL SHEDS INSTALLED AT EXPO 2 AND 4. FIELD CONDITIONS DO NOT MATCH APPROVED DOB PLANS. FIELD CONDITIONS POSES #39201420K | Oct 27, 2026 | $2,500 |
| Aug 21, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION, OBSERVED INSTALLED SUPPORT SCAFFOLD NOT FULLY PLANKED AND MISSING GUARDRAILS. CONDITIONS POSE UNSAFE HAZARD AT SITE. PARTIAL STOP WORK ORDER ISSUED FOR VIOLATION OF BC3314.1; BC3314.1, CO #39201418L | Oct 27, 2026 PENDING | $2,500 |
| Aug 21, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION, OBSERVED ADDITIONAL WORK OUTSIDE OF APPROVED DOB PLANS AT ROOF AND EXPO 2 AND 3. NO MENTION OF BRICK REPLACEMENT OR ROOF, BULK HEAD, AND EXPO 2 AND 3 LINTELS WERE ON PLANS. PARTIAL STOP I #39201423X | Oct 27, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #14204 | DOB VIOLATION - ACTIVE |
| Jun 28, 1993 | LOCAL LAW 62/91 - BOILERS #16674 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Jun 28, 1993 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 21, 2026 | ECB | Construction: AT TIME OF INSPECTION, OBSERVED INSTALLED SHED MISSING CROSS BAR FROM BACK TO FRONT POST AND ADDITIONAL SHEDS INSTALLED AT EXPO 2 AND 4. FIELD CONDITIONS DO NOT MATCH APPROVED DOB PLANS. FIELD CONDITIONS POSES | Closed |
| Aug 21, 2026 | ECB | Unknown: AT TIME OF INSPECTION, OBSERVED INSTALLED SUPPORT SCAFFOLD NOT FULLY PLANKED AND MISSING GUARDRAILS. CONDITIONS POSE UNSAFE HAZARD AT SITE. PARTIAL STOP WORK ORDER ISSUED FOR VIOLATION OF BC3314.1; BC3314.1, CO | Open |
| Aug 21, 2026 | ECB | Construction: AT TIME OF INSPECTION, OBSERVED ADDITIONAL WORK OUTSIDE OF APPROVED DOB PLANS AT ROOF AND EXPO 2 AND 3. NO MENTION OF BRICK REPLACEMENT OR ROOF, BULK HEAD, AND EXPO 2 AND 3 LINTELS WERE ON PLANS. PARTIAL STOP I | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)