4 floors · 69 apartments · 63,100 sq ft · built 1915 · class D5 · owner of record: Workable 239 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 63,100 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 302 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 789 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2593). Agency page | Dec 31, 2033 in 2615 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 21, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. AT TIME OF INSPECTION OBSERVED OPEN HOLE PENETRATIONS AND SEPARATION AT WALL CORN #39208800Y | Jan 6, 2027 PENDING | $2,500 |
| Oct 21, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI OBSERVED BUILDING FIRE DOORS DEFECTIVE, DOOR IS NOT SELF CLOSING ADEQUATELY, FIRE EXIT SIGNAGE IN A BIKE ROOM WITH NO EGRESS, WATER LEAKS AT THE WINDO #39208798Y | Jan 6, 2027 PENDING | $5,000 |
| Oct 21, 2026 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT TIME OF INSPECTION OBSERVED WALL IN FRONT OF APARTMENT 4F AND 3F ATTACHED TO LAUNDRY ROOM NOT CONFROMING TO PLANS PROVIDED #39208801X | Jan 6, 2027 PENDING | $1,250 |
| Oct 21, 2026 | Construction CLASS - 2 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED FULL HEIGHT PARTITIONS CREATING 2 BEDROOMS IN APARTMENT 3N, OBTAIN ALL PERMITS #39208797M | Jan 6, 2027 PENDING | $1,250 |
| Oct 21, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED SPRINKLER SYSTEM IMPROPERLY MAINTAINED, SPRINKLER HEADS IN BEADED INTO THE WALL AND THE CEILING NOT ALLOWING FOR PROPER FUNC #39208799X | Jan 6, 2027 PENDING | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00539 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01370 | DOB VIOLATION - ACTIVE |
| Jan 10, 2001 | CONSTRUCTION HAZ #01HD01 | DOB VIOLATION - ACTIVE |
| Jan 10, 2001 | CONSTRUCTION W/O PERMIT FULL PARTITION WALLS ERECTED AT 3RD AND 4TH STORIES CREATI NG 9 ART STUDIOS AT 33RD FL AND SIX ART STUDIOS APT ON 4TH FL EACH WI THFULL BATHROOMS AND KITCHEN SPACE WITH ELECTRIC STOVE REMEDY OBTAIN PERMIT #01HD03 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Jan 10, 2001 | CONSTRUCTION #01HD04 | DOB VIOLATION - ACTIVE |
| Jun 29, 2000 | CONSTRUCTION HAZARDOUS #01HD01 | DOB VIOLATION - ACTIVE |
| May 15, 2000 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: RENOVATION AT 1ST STORY SOUTH. FULL PARTITIONS ERECTED CREATING TWO ROOMS AND BATHROOMS WITH GRID CEILING HUNG WITH TIE WIRE FOR SUPPORT. ALSO 1ST FLOOR IS BEING OCCPIED AS WO OD WORKING SHOP. STOP ALL WORK #01HD01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 11, 2000 | CONSTRUCTION #01HD01 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02941 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 21, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. AT TIME OF INSPECTION OBSERVED OPEN HOLE PENETRATIONS AND SEPARATION AT WALL CORN | Open |
| Oct 21, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI OBSERVED BUILDING FIRE DOORS DEFECTIVE, DOOR IS NOT SELF CLOSING ADEQUATELY, FIRE EXIT SIGNAGE IN A BIKE ROOM WITH NO EGRESS, WATER LEAKS AT THE WINDO | Open |
| Oct 21, 2026 | ECB | Construction: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT TIME OF INSPECTION OBSERVED WALL IN FRONT OF APARTMENT 4F AND 3F ATTACHED TO LAUNDRY ROOM NOT CONFROMING TO PLANS PROVIDED | Open |
| Oct 21, 2026 | ECB | Construction: WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED FULL HEIGHT PARTITIONS CREATING 2 BEDROOMS IN APARTMENT 3N, OBTAIN ALL PERMITS | Open |
| Oct 21, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED SPRINKLER SYSTEM IMPROPERLY MAINTAINED, SPRINKLER HEADS IN BEADED INTO THE WALL AND THE CEILING NOT ALLOWING FOR PROPER FUNC | Open |
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 10:55 AM ET. BBL 3025930001.