Brooklyn · Block 1682 · Lot 68 · 11233

239 Bainbridge Street

4 floors · 8 apartments · 9,240 sq ft · built 1910 · class C1 · owner of record: Bainridge Cluster Associates, Lp

8open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 68 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 84 days
Annual
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 799 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-24 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#14196
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#34627
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 3, 2008Boiler LL6291
Active
HPD (5) · C 0 · B 2 · A 3
IssuedClassViolationCorrect by
Aug 10, 2026AApt 3B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... OBSERVED AT CEILING LESS THAN 10SQFT IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTNov 13, 2026
Aug 10, 2026BApt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH AT NORTH 1 WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTSep 14, 2026
Mar 31, 2023BApt 1A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... NORTH WALL (APPROX. 10 SQFT) IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, APARTMENT AT WESTMay 5, 2023
Oct 31, 2017AApt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, APARTMENT AT EASTFeb 3, 2018
Oct 31, 2017AApt 2B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, APARTMENT AT EASTFeb 3, 2018

Issued in the last 120 days

DateSourceWhatNow
Aug 10, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... OBSERVED AT CEILING LESS THAN 10SQFT IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Aug 10, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH AT NORTH 1 WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 10:43 AM ET. BBL 3016820068.

Look up another building