6 floors · 13 apartments · 14,700 sq ft · built 1920 · class C1 · owner of record: West 146th Street L.P.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-19 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 31, 2026 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 5, 2026 |
| Aug 31, 2026 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 5, 2026 |
| Mar 4, 2026 | C | Apt 2B · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 4, 2026 |
| Mar 4, 2026 | C | Apt 2B · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 4, 2026 |
| Mar 4, 2026 | C | Apt 2A · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 4, 2026 |
| Mar 2, 2026 | C | Apt 2A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 16, 2026 |
| Oct 30, 2025 | A | Apt 2B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 2, 2026 |
| Oct 30, 2025 | A | Apt 2B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, THE NORTH WALL AND THE CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 2, 2026 |
| Oct 30, 2025 | A | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT SWITCH AT THE NORTH WALL IN THE FOYER LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 2, 2026 |
| Aug 18, 2025 | A | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WARPED WOOD FLOOR [ WALK AREA ] IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 21, 2025 |
| Aug 18, 2025 | A | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WARPED WOOD FLOOR [ WALK AREA ] IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 21, 2025 |
| Aug 18, 2025 | A | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 21, 2025 |
| Sep 22, 2022 | A | Apt 5A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CLOSET CEILING AND SOUTH WALL IN THE FOYER LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 26, 2022 |
| Sep 21, 2022 | B | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE THE OBSTRUCTION IN FIREPROOF PASSAGEWAY BARBEQUE GRILL AT 1st FIRE PASSAGE WAY FROM EAST | Oct 26, 2022 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 31, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Aug 31, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 4:01 AM ET. BBL 1020310053.