Brooklyn · Block 5939 · Lot 20 · 11209

238 Bay Ridge Parkway

4 floors · 80 apartments · 90,140 sq ft · built 1917 · class C1 · owner of record: Ridgecrest Realty Llc

7open violations
$330ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 90,140 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5939). Agency page

Dec 31, 2029
in 1143 days
Next due 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-01 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $330 owed
IssuedViolationHearingBalance
Dec 4, 2025Construction CLASS - 2
E.C.B VIOLATION ISSUED FOR ACTIVE JOB PERMIT # B00376665-I1-EL WHICH EXPIRES ON 7/23/2026 AT TIME OF INSPECTION OBSERVED PERMIT ARE NOT POSTED AT THE PREMISES OR APT DOOR 2C, POST/PROPERLY POST PERMIT
#39169402J
Dec 11, 2026
DEFAULT
$330
DOB (2)
IssuedViolationStatus
Feb 10, 1997LOCAL LAW 62/91 - BOILERS

#29234
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#34381
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Feb 10, 1997Boiler LL6291
Active
Jul 25, 1994Boiler LL6291
Active
HPD (2) · C 0 · B 2 · A 0
IssuedClassViolationCorrect by
Aug 17, 2026B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIRCONDITIONER BRACKET PROTRUDING BEYOND WINDOW SILL APROX MORE THAN 4 INCHES AT 1ST STACK FROM EAST AT SOUTH BUILDING FRONT AT FIRE ESCAPE, 2nd STORYSep 21, 2026
Aug 17, 2026B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD ITEMS AT 1ST STACK FROM EAST AT SOUTH BUILDING FRONT AT FIRE ESCAPE, 3rd STORYSep 21, 2026

Issued in the last 120 days

DateSourceWhatNow
Aug 17, 2026HPD B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES AIRCONDITIONER BRACKET PROTRUDING BEYOND WINDOW SILL APROX MORE THAN 4 INCHES AT 1ST STACK FROM EAST AT SOUTH BUILDING FRONT AT FIRE ESCAPE, 2nd STORYOpen
Aug 17, 2026HPD B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD ITEMS AT 1ST STACK FROM EAST AT SOUTH BUILDING FRONT AT FIRE ESCAPE, 3rd STORYOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 5:04 PM ET. BBL 3059390020.

Look up another building