Bronx · Block 3828 · Lot 37 · 10462

2360 Powell Avenue

1 floors · 5,000 sq ft · built 1975 · class E1 · owner of record: Thomas Borek

2open violations
$3,650ECB/OATH penalties owed
0HPD class C (immediately hazardous)
65dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 65 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)

Open violations

ECB / OATH (2) · $3,650 owed
IssuedViolationHearingBalance
Sep 30, 2026Construction CLASS - 2
AT THE TIME OF INSPECTION OF A 1-STORY BUILDING, I OBSERVED SIDEWALK SHED IN PLACE, DURING MY INSPECTION I NOTICED SIDEWALK SHED HAS NO BUILDING INFORMATION PANEL. THIS CREATE A HAZARDOUS SITUATION FOR FIRST RE
#39559964P
Dec 4, 2026
PENDING
$1,250
Sep 30, 2026Construction CLASS - 2
AT THE TIME OF INSPECTION OF A 1-STORY BUILDING, I OBSERVED A SIDEWALK SHED ERECTED ALONG AN ACTIVE DRIVEWAY. SHEDS POST LACK REQUIRED HIGHLY VISIBILITY REFLECTORS, CREATING A HAZARDOUS CONDITION FOR VEHICLES E
#39559965R
Dec 4, 2026
PENDING
$2,400
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 30, 2026ECBConstruction: AT THE TIME OF INSPECTION OF A 1-STORY BUILDING, I OBSERVED SIDEWALK SHED IN PLACE, DURING MY INSPECTION I NOTICED SIDEWALK SHED HAS NO BUILDING INFORMATION PANEL. THIS CREATE A HAZARDOUS SITUATION FOR FIRST REOpen
Sep 30, 2026ECBConstruction: AT THE TIME OF INSPECTION OF A 1-STORY BUILDING, I OBSERVED A SIDEWALK SHED ERECTED ALONG AN ACTIVE DRIVEWAY. SHEDS POST LACK REQUIRED HIGHLY VISIBILITY REFLECTORS, CREATING A HAZARDOUS CONDITION FOR VEHICLES EOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 9:51 AM ET. BBL 2038280037.

Look up another building