Bronx · Block 3187 · Lot 36 · 10468

2351 Walton Avenue

12 floors · 61 apartments · 36,161 sq ft · built 2022 · class D1 · owner of record: 2351 Walton Avenue Housing Development F Und Corp.

6open violations
$5,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
52dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 52 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 52 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 68 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 36,161 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 173 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 173 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 296 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

Feb 21, 2028
in 469 days
No Cycle 10 report on record yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1148 days
Next cycle year 2029

Open violations

ECB / OATH (4) · $5,000 owed
IssuedViolationHearingBalance
Sep 17, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, OBSERVED THE VIOLATING CONDITION HAS BEEN CORRECTED. HOWEVER, NO CERT
#39204566R
Dec 4, 2026
PENDING
$1,250
Jan 12, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED PLASTIC PANELS OVER HOLE IN CEILING IN COMMON AREA. LOCATED THROUGHOUT THE BUILDING. POTENTIAL FIRE/SMOKE HAZARD., REPAIR AND/REPLACE
#39173797P
Mar 5, 2027
PENDING
$2,500
Jan 12, 2026Construction CLASS - 2
OBSERVED THROUGHOUT THE BUILDING LACK OF FIRE STOP AT PIPE PENETRATIONS THROUGH CEILINGS AND WALLS. PLASTIC CAPS ARE INSTALLED ON THE STANDPIPE. ON THE 12 TH FLOOR STAIRCASE AND FIRST FLOOR SPRINKLER HEAD OBSTR
#39173386K
Mar 20, 2026
STIPULATION/IN-VIO
$1,250
May 1, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED UNPERMITTED FLEX HOSE ATTACHED TO THE COMMERCIAL DRYER. POTENTIAL FIRE HAZARD., REPAIR AND/REPLACE
#39146775K
Jan 22, 2026
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Aug 12, 2026AEUHAZ FTC-AEU-HAZ
Active
Mar 6, 2026Energy Grade - LL33 FTP-EN-EGRDEA
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER AD CODE SEC. 28-309.12.3
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 17, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, OBSERVED THE VIOLATING CONDITION HAS BEEN CORRECTED. HOWEVER, NO CERTOpen
Aug 12, 2026DOB SafetyAEUHAZ: Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 9, 2026, 1:18 PM ET. BBL 2031870036.