5 floors · 10 apartments · 9,880 sq ft · built 1900 · class C4 · owner of record: Dreamyard Mid Harlem Housing Development Fund Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 777 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-25 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 11, 2026 | Construction CLASS - 1 ATOI, OBSERVED FAILURE TO COMPLY WITH PARTIAL VACATE ORDER #M55/2026P BY PERMITTING OCCUPANCY OF APARTMENTS 2A, 3A, 4A, AND 5A WITHOUT A FIREGUARD PRESENT ON THE PREMISES., COMPLY WITH VACATE ORDER; COMPLY WITH #39188015N | Jan 28, 2027 PENDING | $10,000 |
| Apr 5, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED APPROX 5'X3' SECTION OF CORNICE HAS DISLODGED, AND FALLEN TO GRADE(PEDESTRIAN SIDEWALK) ABOVE ENTRANCE TO BUILDING @ EXP.1(FRONT OF BUILDING). REMAINING SECTION OF CORNICE IN DANG #35685887M | Jan 7, 2027 | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Apr 5, 2026 | CONSTRUCTION ENGINEERS REPORT REQUESTED DUE TO 5X3FT SECTION OF CORNICE THAT HAS FA LLEN TO PEDESTRIAN SIDEWALK BELOW BUILDING ENTRANCE REMEDY: OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERTINSPECTION@BUILDING S.NYC.GOV W/IN 7 DAYS ADDRESSING ALL CONDS W/PLANS, PHOTOS, TIMEFRAME FOR REPAIR COMPLETION, AND REPAIRS T #CER01CR | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 31, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 31, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 8:43 PM ET. BBL 1018310012.