37 floors · 884 apartments · 728,739 sq ft · built 1960 · class D6 · owner of record: 235 Fee Owner Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1316). Agency page | Dec 31, 2026 in 43 days | Due this year |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 95 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 728,739 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 8, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION, OBSERVED WORKERS PERFORMING GRINDING OPERATIONS USING TWO SEPARATE HANDHELD GRINDERS WITHOUT REQUIRED SAFETY GUARDS AND SIDE HANDLES, CONTRARY TO BC 3301.6. STOP ALL USE OF GRINDERS. PROV #39558913K | Nov 12, 2026 PENDING | $2,500 |
| Dec 23, 2025 | Unknown CLASS - 1 NOTE: AT THE TIME OF INSPECTION, A REVIEW OF DEPARTMENT RECORDS INDICATED THAT THE PERMIT HOLDER FAILED TO NOTIFY THE DOB OF AN INCIDENT WITHIN (3) BUSINESS DAYS VIA ELECTRONIC PORTAL, AS REQUIRED BY 28-103.21. #39548407Z | May 20, 2027 | $10,000 |
| Dec 11, 2025 | Unknown CLASS - 1 RESPONDING TO AN INCIDENT WHERE A WORKER FELL 6 FEET FROM A PLATFORM LADDER WHILE DISMANTLING A CRANE TIMBERLAND DERRICK. INSPECTION REVEALED THAT THE LADDER WAS NOT ON A FLAT AND LEVEL SURFACE OR FULL OPENED A #39547877Z | Sep 17, 2026 IN VIOLATION | $2,500 |
| Nov 3, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OF A BUILDING UNDER DEMOLITION AND EXCAVATION AT CELLER LEVEL I OBSERVED MECHANICAL EQUIPMENT ON SITE USED FOR OPERATION UPON REVIEWING THE SITE SAFETY PLAN TO VERIFY COMPLIANCE AND LOCATI #39546629P | Jan 8, 2026 IN VIOLATION | $2,500 |
| Aug 6, 2025 | Construction CLASS - 1 INCIDENT OCCURRED WHERE A METAL PANEL FELL FROM THE 33RD FLOOR AND LANDED ON THE SIDEWALK.INSPECTION REVEALED DEBRIS WAS THROWN FROM THE ROOF TO THE 33RD FLOOR WITHOUT AN ENCLOSED SHAFTWAY(3306.9.12.1)DEBRIS RI #39543343X | May 21, 2026 IN VIOLATION | $10,000 |
| Aug 6, 2025 | Unknown CLASS - 1 RESPONDING TO AN INCIDENT WHERE A PIECE OF METAL PANEL FELL OFF THE BUILDING FROM THE 33RD FLOOR LEVEL AND LANDED ON THE SIDEWALK. UPON ARRIVING ON SITE IT WAS OBSERVED THAT THE METAL PANEL ON THE SIDEWALK WAS #39543342Y | May 21, 2026 IN VIOLATION | $2,500 |
| Jul 21, 2025 | Construction CLASS - 2 AT THE TIME OF INCIDENT, ACTIVE DEMO AND ALTERATION JOB SITE AT 33 STORIES, WHERE A PIECE OF WINDOW SPANDREL GLASS FELL FROM THE 8TH FLOOR AT EXPOSURE#1 OF THE BUILDING HITTING SIDEWALK SHED, INSPECTION REVEAL #39542631X | Mar 2, 2027 | $5,030 |
| Issued | Violation | Status |
|---|---|---|
| Sep 11, 2026 | CONSTRUCTION STEEL HIGH-RISE UNDER ALT. W/SIGNIFICANT DAMAGE & DEFORMATION. REMEDY:COMPLY WITH CODE.BY 9/31/26,PROVIDE CONSTRUCTION SUPERINTENDENT LOG #CE10601NB | DOB VIOLATION - ACTIVE |
| Sep 11, 2026 | CONSTRUCTION STEEL HIGH-RISE UNDER ALT. W/ SIGNIFICANT DAMAGE & DEFORMATION REMEDY:COMPLY WITH CODE.BY 9/31/26,PROVIDE SITE SAFETY LOG #CE10602NB | DOB VIOLATION - ACTIVE |
| Sep 1, 2026 | CONSTRUCTION STEEL HIGH-RISE UNDER ALT. W/ SIGNIFICANT DAMAGE & DEFORMATION.COLS 62&63 EXHIBITED SIGNS OF FAILURE, FL 21-22. COL REMOVAL UNDER M011442594. ADD'L INFO REQ'D.REMEDY:LABEL & MAINTAIN ALL PIECES ON SITE.SUBMIT DIAGRAM.OBTAIN DOB APPROVAL PRIOR TO TESTING OR REMOVING #CE10601MM | DOB VIOLATION - ACTIVE |
| Jul 9, 2026 | CONSTRUCTION SHOP DWGS - STEEL HIGH-RISE UNDER PERMITTED ALT. COLUMNS BUCKLING FL 21-22. REMEDY:SUBMIT APPROVED/ACCEPTED STEEL SHOP DRAWINGS BY 7/16/26 #CE10602NB | DOB VIOLATION - ACTIVE |
| Jul 9, 2026 | CONSTRUCTION STEEL HIGH-RISE UNDER PERMITTED ALT. WITH SEVERE DAMAGE,DEFORMATION & COLLAPSE RISK.COLUMNS BUCKLING FL 21-22. REMEDY:RETAIN SIA TO INSPECT STRUCTURAL WORK SPECIFIED BY DESIGN APPLICANT AND APPROVED/ACCEPTED DOCUMENTS #CE10601NB | DOB VIOLATION - ACTIVE |
| Jul 7, 2026 | CONSTRUCTION PLUMNESS SURVEY:STEEL HIGH-RISE UNDER PERMITTED ALT.WITH SEVERE DAMAGE,DEFORMATION&COLLAPSE RISK.COLUMNS BUCKLING FL 21-22.BLDG COMPROMISED;HAZARD TO SITE,PUBLIC & ADJOINING PROPERTIES.REMEDY:BY 7/14/26:PROVIDE PLUMBNESS SURVEY (MIN N&W EXPOSURES)SEALED BY NYS PLS RETAIN PE TO SCOPE & SUPERVISE PROG #CE10603NB* | DOB VIOLATION - ACTIVE |
| Jul 7, 2026 | CONSTRUCTION PEER REVIEW-DEPT ORDERING STRUCTURAL PEER REVIEW.STEEL HIGH-RISE UNDER PERMITTED ALT.COLUMNS BUCKLING FL 21-22.REMEDY:PROVIDE NAMES OF 3 PE'S BY 7/14/26. SUBMIT PEER REVIEW REPORT BY 8/14/26 #CE10606NB | DOB VIOLATION - ACTIVE |
| Jul 7, 2026 | CONSTRUCTION FORENSIC INVESTIGATION-DEPT ORDERING FORENSIC ENG. INVESTIGATION STEEL HIGH-RISE UNDER PERMITTED ALT. COLUMNS BUCKLING FL 21-22 REMEDY:PROVIDE NAMES OF 3 PES BY 7/14/26.SUBMIT FORENSIC ENGINEERING INVESTIGATION REPORT BY 8/31/26 #CE10607NB | DOB VIOLATION - ACTIVE |
| Jul 7, 2026 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. OBSERVED PREMISES UNDER ALTERATION #M01075133-S3-ST. STRUCTURAL STEEL MEMBERS AT UPPER FLOORS HAVE FAILED COMPROMISING STRUCTURAL STABILITY. BUILDING IN DANGER OF COLLAPSING. #26-01724 | DOB VIOLATION - ACTIVE |
| Jul 7, 2026 | CONSTRUCTION FTM/ADDL INFO:STEEL HIGH-RISE UNDER PERMITTED ALT. WITH SEVERE DAMAGE, DEFORMATION&COLLAPSE RISK. COLUMNS BUCKLING FL 21-22.FULL EXTENT OF DMG UNKNOWN, CONCEALED BY FINISHES.REMEDY:PE TO SUPV SAFE FINISH RMVL & 100% HANDS-ON INSP EXPOSED STRUCT STL/CONNS. RPT BY 7/14/26 #CE10604NB | DOB VIOLATION - ACTIVE |
| Jul 7, 2026 | CONSTRUCTION INSPN RPTS/RECORDS-STEEL HIGH-RISE UNDER PERMITTED ALT. WIT SEVERE DAMAGE,DEFORMATION&COLLAPSE RISK.COLUMNS BUCKLING FL 21-22 REMEDY:SUBMIT INSP RPTS,FIELD NOTES,DOB TR FORMS & SUMMARY OF NCRS BY 7/8/26 #CE10605NB | DOB VIOLATION - ACTIVE |
| Jul 7, 2026 | CONSTRUCTION MONITORING:STEEL HIGH-RISE UNDER PERMITTED ALT. W/ SEVERE DAMAGE, DEFORMATION&COLLAPSE RISK. COLUMNS BUCKLING FL 21-22.BLDG COMPROMISED; SITE, PUBLIC & ADJOINING PROPERTIES.REMEDY:START CONTINUOUS MONITORING PE TO SUPERVISE, PROVIDE PLAN BY 7/8/26, INSTALL/BASELINE BY 7/7/26 NOTIFY DOB OF SIGFCNT MV #CE10602NB | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9028/570829 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9028/570830 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570840 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570828 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570829 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570830 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570831 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570832 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570833 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570834 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570835 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570836 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570837 | DOB VIOLATION - ACTIVE |
| Apr 4, 2016 | ELEVATOR #9027/570838 | DOB VIOLATION - ACTIVE |
| Apr 1, 2016 | ELEVATOR #9028/570839 | DOB VIOLATION - ACTIVE |
| Apr 1, 2016 | ELEVATOR #9028/570828 | DOB VIOLATION - ACTIVE |
| May 12, 2008 | ELEVATOR #1P24851 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 14, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 14, 2026 | DOB Safety | AEUHAZ: | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Sep 11, 2026 | DOB | CONSTRUCTION: STEEL HIGH-RISE UNDER ALT. W/SIGNIFICANT DAMAGE & DEFORMATION. REMEDY:COMPLY WITH CODE.BY 9/31/26,PROVIDE CONSTRUCTION SUPERINTENDENT LOG | Open |
| Sep 11, 2026 | DOB | CONSTRUCTION: STEEL HIGH-RISE UNDER ALT. W/ SIGNIFICANT DAMAGE & DEFORMATION REMEDY:COMPLY WITH CODE.BY 9/31/26,PROVIDE SITE SAFETY LOG | Open |
| Sep 8, 2026 | ECB | Unknown: AT TIME OF INSPECTION, OBSERVED WORKERS PERFORMING GRINDING OPERATIONS USING TWO SEPARATE HANDHELD GRINDERS WITHOUT REQUIRED SAFETY GUARDS AND SIDE HANDLES, CONTRARY TO BC 3301.6. STOP ALL USE OF GRINDERS. PROV | Open |
| Sep 1, 2026 | DOB | CONSTRUCTION: STEEL HIGH-RISE UNDER ALT. W/ SIGNIFICANT DAMAGE & DEFORMATION.COLS 62&63 EXHIBITED SIGNS OF FAILURE, FL 21-22. COL REMOVAL UNDER M011442594. ADD'L INFO REQ'D.REMEDY:LABEL & MAINTAIN ALL PIECES ON SITE.SUBMIT DIAGRAM.OBTAIN DOB APPROVAL PRIOR TO TESTING OR REMOVING | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 9:28 PM ET. BBL 1013160023.