2 floors · 9,608 sq ft · built 1926 · class G1 · owner of record: Fordham Development Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 15, 2005 | Construction Hazardous FAILURE TO MAINTAIN BLDG DEFECT NOTED:SECOND FLOOR WOOD ROOF RAFTERS ARE NOT COVERED W/ FIRE PROOF MATERIAL THRU-OUT. REMEDY:MAINTAIN BLDG INSTALL FIRE RATED CEILING. #34492460X | Mar 4, 2005 WRITTEN OFF | $0 |
| Apr 14, 2004 | Construction Hazardous FAILURE TO MAINTAIN BUILDING. FIRE PROOFING HAS FALLEN FROM SUPPORTINGSTEEL BEAM ON 1ST FLOOR MAIN STEEL BEAM. ON 2ND FL. CEILING WOOD JOISTS ARE NOT COVERED W/ FIRE PROOFING MATERIAL. REMEDY: MAINTAIN BUILDING #34425821M | May 20, 2005 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 26, 2024 | CONSTRUCTION EMERGENCY WORK.AT 2NDFL WINDOW OPENING OVER GROUNDFL GARAGE ENTRANCE, THE SINGLE WYTHE BRICK PIER PRTLLY SUPPORTNG STONE ARCH IS BULGD OUTWRD W/CRCKS. IMMED INSTLL TEMP SHORNG&RMVE&REPLACE BRCK PIER WYTHE C BULGE IN KIND W/LATERAL TIES PER PE.ALL WRK TO BE SPRVSD #FEU20501BS | DOB VIOLATION - ACTIVE |
| Jun 26, 2024 | CONSTRUCTION FAILURE TO MAINTAIN.ROOF IN DISREPAIR W/SGNS OF WATER DMGE THROUGHOUT, ROTTD WOOD DECLINING C MULT LOCATIONS,1.ROTTD ROOF JOISTS MIN&NEW WALL @2NDSTORY.RUSTNG EXPOSD GIRDR BEAM ENDS VISIBLE@CENTER.1.NYSPE STRCRTL ENGNEER TO EVAL ENT BLDG&DSGN RPAIRS BY 8/26/24,4.OBTN PRMTS& STRT WRK BY 9/9/24 #FEU20502BS | DOB VIOLATION - ACTIVE |
| May 3, 2023 | CONSTRUCTION AT THE ACTIVE PARKING GARAGE CONCRETE STRUCTURE, OBSERVED IN THE STATE OF DISREPAIR WITH VERTICAL CRACKS IN THE WALL AND AT THE LOAD BEARING CONCRETE BEAMS, SPALLING CONCRETE AND EXPOSED STEEL REINFORCEMENT OBSERVED DURING MY INSPECTION THROUGHOUT THE FIRST FLOOR AND SECOND FLOOR. #23-01279 | DOB VIOLATION - ACTIVE |
| Apr 26, 1991 | CONSTRUCTION #7J2 | DOB VIOLATION - ACTIVE |
| Apr 26, 1991 | CONSTRUCTION #7J2 | VIOLATION UNSERVED ECB-ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 1:20 PM ET. BBL 2031510020.