Bronx · Block 2810 · Lot 20 · 10457

234 East 178 Street

4 floors · 26 apartments · 26,000 sq ft · built 1912 · class C1 · owner of record: Paradigm Holding Nyc Llc

119open violations
$9,687ECB/OATH penalties owed
20HPD class C (immediately hazardous)
44dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 26,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-05 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (7) · $9,687 owed
IssuedViolationHearingBalance
Mar 26, 2024Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 371(J). NOTED: AT TIME OF INSPECTION KEY LOCKING DEVICES OBSERVED INSTALLED AT 6 BDRM ENTRY DOORS I
#39109928J
Nov 12, 2024
IN VIOLATION
$1,250
Mar 26, 2024Construction CLASS - 2
W/O A PERMIT. NOTED: AT APT C - FULL HEIGHT PARTITION WALLS ERECTED CHANGING FLOOR LAYOUT & CREATING ADDL'T BDRMS., OBTAIN ALL PERMITS
#39109933Y
Nov 12, 2024
IN VIOLATION
$1,250
Mar 26, 2024Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT EXPOSURE 3 - 1. STONE SLAB RETAINING WALL OBSERVED DETERIORATED & BULGING OUTWARD WITH DEFECTIVE CHAIN LINK FENCE ON TOP (FALL POTENTIAL; 2. FIRE
#39109932M
Nov 12, 2024
IN VIOLATION
$1,250
Mar 26, 2024Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION - RAZOR BARBED WIRE OBSERVED INSTALLED ABOVE METAL FENCE & GATE AT EXPOSURE 2 OF A 4 STORY RESIDENTIAL BUILDING, CREATING A CU
#39109931K
Mar 25, 2025
IN VIOLATION
$312
Mar 26, 2024Construction CLASS - 1
CONTRARY TO DOB/OFFICIAL RECORDS WHICH INDICATES 1ST FLR AS CLASS 'A' APTS: AT TIME OF INSPECTION - APT C OBSERVED CREATED & OCCUPIED AS 6 SRO'S; EACH WITH KEY LOCKS, SOME NUMBERED DOORS, FOOD ITEMS, TOILETRIES
#39109930Z
Nov 12, 2024
IN VIOLATION
$2,500
Mar 26, 2024Construction CLASS - 2
EXIT DOOR NOT SELF CLOSING. NOTED: AT TIME OF INSPECTION - 1ST FLR APT C ENTRY DOOR OBSERVED NOT SELF CLOSING, CREATING A FIRE HAZARD CONDITION., REPAIR/REPLACE DOOR
#39109929L
Nov 12, 2024
IN VIOLATION
$625
Aug 3, 2022Construction CLASS - 1
OBSERVED 2 WORKERS ON SUSPENDED ROPE SCAFFOLD AT EXPO#4 WITH MISSING GUARDRAIL SYSTEM TOO PREVENT A FALL HAZARD TO WORKERS RESULTING IN INJURY OR WORSE.STOP ALL USE OF SUSPENDED ROPE SCAFFOLD PROVIDE GUARDRAIL
#39504536K
Dec 16, 2022
IN VIOLATION
$2,500
DOB (35)
IssuedViolationStatus
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#07293
DOB VIOLATION - ACTIVE
Dec 13, 2011LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
#07292
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#08505
DOB VIOLATION - ACTIVE
Dec 31, 2009LOW PRESSURE BOILER

#08504
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#09294
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#09293
DOB VIOLATION - ACTIVE
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#09256
DOB VIOLATION - ACTIVE
Jan 3, 2008LOCAL LAW 62/91 - BOILERS

#09257
DOB VIOLATION - ACTIVE
Jan 19, 2007LOCAL LAW 62/91 - BOILERS

#09771
DOB VIOLATION - ACTIVE
Jan 19, 2007LOCAL LAW 62/91 - BOILERS

#09772
DOB VIOLATION - ACTIVE
Jan 6, 2006LOCAL LAW 62/91 - BOILERS

#09354
DOB VIOLATION - ACTIVE
Jan 6, 2006LOCAL LAW 62/91 - BOILERS

#09355
DOB VIOLATION - ACTIVE
Jan 31, 2005LOCAL LAW 62/91 - BOILERS

#10056
DOB VIOLATION - ACTIVE
Jan 31, 2005LOCAL LAW 62/91 - BOILERS

#10057
DOB VIOLATION - ACTIVE
Feb 13, 2004LOCAL LAW 62/91 - BOILERS

#10755
DOB VIOLATION - ACTIVE
Feb 13, 2004LOCAL LAW 62/91 - BOILERS

#10756
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#09639
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#09638
DOB VIOLATION - ACTIVE
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#10567
DOB VIOLATION - ACTIVE
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#10568
DOB VIOLATION - ACTIVE
Feb 27, 2001LOCAL LAW 62/91 - BOILERS

#09849
DOB VIOLATION - ACTIVE
Feb 27, 2001LOCAL LAW 62/91 - BOILERS

#09850
DOB VIOLATION - ACTIVE
Feb 7, 2000LOCAL LAW 62/91 - BOILERS

#10175
DOB VIOLATION - ACTIVE
Feb 7, 2000LOCAL LAW 62/91 - BOILERS

#10174
DOB VIOLATION - ACTIVE
Mar 16, 1999LOCAL LAW 62/91 - BOILERS

#10064
DOB VIOLATION - ACTIVE
Mar 16, 1999LOCAL LAW 62/91 - BOILERS

#10065
DOB VIOLATION - ACTIVE
May 4, 1998LOCAL LAW 62/91 - BOILERS

#14113
DOB VIOLATION - ACTIVE
May 4, 1998LOCAL LAW 62/91 - BOILERS

#14114
DOB VIOLATION - ACTIVE
Sep 16, 1997LOCAL LAW 62/91 - BOILERS

#200732
DOB VIOLATION - ACTIVE
Sep 16, 1997LOCAL LAW 62/91 - BOILERS

#200731
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#19564
DOB VIOLATION - ACTIVE
Jun 9, 1994LOCAL LAW 62/91 - BOILERS

#04701
DOB VIOLATION - ACTIVE
Jun 9, 1994LOCAL LAW 62/91 - BOILERS

#04702
DOB VIOLATION - ACTIVE
May 17, 1993LOCAL LAW 62/91 - BOILERS

#04605
DOB VIOLATION - ACTIVE
May 17, 1993LOCAL LAW 62/91 - BOILERS

#04604
DOB VIOLATION - ACTIVE
DOB NOW Safety (35)
IssuedViolationStatus
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Dec 13, 2011Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Active
Dec 31, 2009Boiler LBLVIO
Active
Dec 31, 2009Boiler LBLVIO
Active
Jan 1, 2009Boiler LL6291
Active
Jan 1, 2009Boiler LL6291
Active
Jan 3, 2008Boiler LL6291
Active
Jan 3, 2008Boiler LL6291
Active
Jan 19, 2007Boiler LL6291
Active
Jan 19, 2007Boiler LL6291
Active
Jan 6, 2006Boiler LL6291
Active
Jan 6, 2006Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
Jan 31, 2005Boiler LL6291
Active
Feb 13, 2004Boiler LL6291
Active
Feb 13, 2004Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Feb 27, 2001Boiler LL6291
Active
Feb 27, 2001Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Mar 16, 1999Boiler LL6291
Active
Mar 16, 1999Boiler LL6291
Active
May 4, 1998Boiler LL6291
Active
May 4, 1998Boiler LL6291
Active
Sep 16, 1997Boiler LL6291
Active
Sep 16, 1997Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
Jun 9, 1994Boiler LL6291
Active
Jun 9, 1994Boiler LL6291
Active
May 17, 1993Boiler LL6291
Active
May 17, 1993Boiler LL6291
Active
HPD (47) · C 20 · B 18 · A 9
IssuedClassViolationCorrect by
Sep 29, 2026BApt D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILED SOUTH WALL IN THE BATHROOM LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 3, 2026
Sep 29, 2026BApt D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 3, 2026
Sep 29, 2026BApt D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE KITCHEN LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 3, 2026
Jun 1, 2026A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMASep 4, 2026
May 29, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL AT PUBLIC HALL, 4th STORYSep 1, 2026
May 29, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 4th STORYSep 1, 2026
May 26, 2026BApt 1C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING, GREATER THEN 10 SQUARE FEET IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHJun 30, 2026
Nov 3, 2023CApt E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 29, 2023
Nov 3, 2023CApt E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHNov 29, 2023
Aug 21, 2023CApt K · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE KITCHEN LOCATED AT APT K, 4th STORY, 1st APARTMENT FROM NORTH AT EASTSep 28, 2023
Aug 21, 2023CApt K · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 3rd WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT K, Sep 28, 2023
Aug 21, 2023CApt K · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE BATSep 28, 2023
Aug 21, 2023CApt K · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD PAINT THAT IS XRF TESTED INCONCLUSIVE AT 0.5 MG/CM2 (28 RCNY §11-07(B)) FROM REQUIRED WINDOW AND/OSep 28, 2023
Jul 10, 2023BApt D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 8 SQ.FT AT CEILING, 4 SQ.FT AT EAST WALL, 4 SQ.FT AT WEST WALL INCLUDING WINDOW FRAME, 2 SQ.FT AT NORTH WALL, AND 8 SQ.FT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM EAug 14, 2023
Feb 16, 2023CApt K · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) NORMar 12, 2023
Feb 16, 2023CApt K · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT K, 4th STORY, 1sMar 12, 2023
Mar 8, 2022BApt I · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT I, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHApr 12, 2022
Mar 1, 2022BApt A · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A, 1st STORY, 1st APARTMENT FROM NORTH AT EASTApr 5, 2022
Feb 8, 2022CApt K · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Feb 12, 2022
Feb 8, 2022CApt K · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Feb 12, 2022
Mar 11, 2020CApt C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT C, 1st STORY, APARTMENT AT SOUTHApr 1, 2020
Mar 11, 2020CApt C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT C, 1st STORY, APARTMENT AT SOUTHApr 1, 2020
Jan 13, 2020BApt C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 13277210 ISSUED 11-SEP-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODEFeb 17, 2020
Dec 16, 2019CApt C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHJan 6, 2020
Sep 13, 2019CApt C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTOct 4, 2019
Jun 10, 2019CApt C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJul 1, 2019
May 23, 2019CApt 1C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJun 13, 2019
May 23, 2019CApt 1C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJun 13, 2019
Sep 21, 2015CApt 1C · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTSep 29, 2015
Aug 26, 2011BApt D · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT D, 2nd STORY, APARTMENT AT SOUTHSep 30, 2011
Jun 6, 2011BApt D · SECTION 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJul 11, 2011
Jun 6, 2011AApt D · SECTION 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE OR REGLAZE PORCELAIN FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHSep 9, 2011
Jun 1, 2011BApt D · SECTION 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE .... IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT D, 2nd STORY, APARTMENT AT SOUTHJul 6, 2011
May 16, 2011BApt D · SECTION 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE .... IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT D, 2nd STORY, APARTMENT AT SOUTHJun 20, 2011
Apr 28, 2011BApt D · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... SOUTH WALL IN THE BATHROOM LOCATED AT APT D, 2nd STORY, APARTMENT AT SOUTHJun 2, 2011
Apr 28, 2011AApt D · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT D, 2nd STORY, APARTMENT AT SOUTHAug 1, 2011
Oct 18, 2010BApt D · SECTION 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE .. IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHNov 22, 2010
Oct 18, 2010BApt D · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHNov 22, 2010
Oct 18, 2010AApt D · SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN FINISH AT BATHTUB, REGLAZE IN THE BATHROOM LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJan 21, 2011
Sep 22, 2010AApt G · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 26, 2010
Jul 29, 2010CApt G · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RISER FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT G, 2nd STORY, 1st APARTMENT FROMAug 24, 2010
Jul 29, 2010CApt G · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RISER FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHAug 24, 2010
Jan 27, 2009AApt 1C · SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTMay 2, 2009
May 29, 2008AD26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR BELL 4TH STY FRONT APT L ENTRANCE DOOR.Sep 1, 2008
May 13, 2008B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES TV ANTENNA FLOWER POT ETC FRONT NORTH ALL STYS.Jun 17, 2008
May 13, 2008BD26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS SINK & TUB 1ST STY EAST APT B KITCHEN & BATHROOM.Jun 17, 2008
May 13, 2008BD26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS HOT & COLD TO SINK 1ST STY REAR EAST APT B KITCHEN.Jun 17, 2008

Issued in the last 120 days

DateSourceWhatNow
Sep 29, 2026HPD C§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE BATHROOM LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHClosed
Sep 29, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILED SOUTH WALL IN THE BATHROOM LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Sep 29, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Sep 29, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE KITCHEN LOCATED AT APT D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 2:50 PM ET. BBL 2028100020.

Look up another building