Brooklyn · Block 1380 · Lot 39 · 11213

234 Buffalo Avenue

2 floors · 3 apartments · 3,000 sq ft · built 1922 · class S9 · owner of record: Kissler Assetts Llc

18open violations
$0ECB/OATH penalties owed
11HPD class C (immediately hazardous)
63dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 63 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Registered through 2027-09-01

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Dec 21, 2016Construction CLASS - 2
FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES.OBSERVED MASONRY WITH EXTENSIVE CRACKS ON EXP1 AND 2 AT TOP OF 2ND FLOOR WINDOW LINTELS,AT ENTRANCE DOOR ON EXP1.OBSERVED TOP OF PARAPET WALL ON EXP2 LEANING,AND
#35113922P
May 8, 2017
WRITTEN OFF
$0
Dec 1, 2006Construction Non-Hazardous
FAILURE TO MAINTAIN. DEFECT IS:CEILING(APPROX.4"X12")ON 1ST FLR(LAUNDROMAT)DAMAGED DUE TO WATER LEAK FROM THE ROOF. REMEDY:REPAIR DEFECT.
#34547490M
Jan 29, 2007
WRITTEN OFF
$0
Jan 8, 2004Construction Non-Hazardous
FAILURE TO MAINTAIN EXTERIOR BUILDING WALL HAZARDOUS NOTED BULDGING & CRACKING OF NORTH EXTERIOR BRICK WALL AT VARIOUS LOCATIONS EG:NORTH EAST CORNER OF PARAPETTE WALL MID POINT BETWEEN 1ST & 2ND FLOOR APPROX 1
#34426976L
Jul 14, 2004
WRITTEN OFF
$0
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 8)
Active
HPD (14) · C 11 · B 3 · A 0
IssuedClassViolationCorrect by
Dec 24, 2018C§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM ON THE WALL 1ST ATORY PUBLIC HALLJan 1, 2019
Dec 24, 2018C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR TO BOILER ROOM LOCKED CELLARJan 1, 2019
Jan 27, 2012BApt 2 · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 2, 2012
Jan 27, 2012BApt 2 · SECTION 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES ... IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 2, 2012
Jan 27, 2012BApt 2 · SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 2, 2012
Sep 24, 2009CSECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM : DOOR LOCKED AT BOILER ROOM, CELLARSep 30, 2009
Sep 16, 2005CApt 2R · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 12, 2005
Aug 17, 2005CApt 2R · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) BASEBOARD AT SOUTH WALL, BASEBOARD AT EAST WALL, SOUTH WALL, EAST WALL, WEST WALSep 12, 2005
Aug 17, 2005CApt 2R · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) BASEBOARD AT SOUTH WALL, BASEBOARD AT WEST WALL, 1st DOOR FROM EAST AT SOUTH WALSep 12, 2005
Aug 17, 2005CApt 2R · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) BASEBOARD AT NORTH WALL, BASEBOARD AT EAST WALL, BASEBOARD AT WEST WALL, CEILINGSep 12, 2005
Aug 17, 2005CApt 2R · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT ASep 12, 2005
Aug 17, 2005CApt 2R · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) BASEBOARD AT NORTH WALL, 1st DOOR FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM WSep 12, 2005
Aug 17, 2005CApt 2R · SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY ?11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOORSep 12, 2005
Mar 1, 2004CApt 2-F · SECTION 27-2056.5 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR IS ON A DETERIORATED SUBSURFACE - USING EXCLUSIVE INTERIM CONTROLS. CEILING, EAST WALL, WEST WALL, NORTH WALL, SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2-F, 2nd STORY, APARTMApr 1, 2004

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 8:24 AM ET. BBL 3013800039.

Look up another building