| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 44 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 227,773 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1424). Agency page | Dec 31, 2034 in 2966 days | Next due 2034 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | On file | Cycle 10 filing on record: SAFE (2025-05-06) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 3, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION, OBSERVED BETAMAX MATERIAL HOIST INSTALLED IN CONJUNCTION WITH AN ADJUSTABLE SUSPENDED SCAFFOLD. APPROVED CONSTRUCTION DOCUMENTS CONTAINED NO DETAILS FOR THIS INSTALLATION, CONTRARY TO AC #39556167Z | Aug 9, 2027 DEFAULT | $6,250 |
| Jul 3, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION, OBSERVED BETAMAX MATERIAL HOIST INSTALLED AT ROOF LEVEL ON EXPOSURE 2 WITHOUT REQUIRED OVERHEAD PROTECTION BELOW, CONTRARY TO BC 3301.2. STOP ALL WORK UNDER PERMIT NO. M01210293-I1-GC. PR #39556168K | Aug 9, 2027 DEFAULT | $10,000 |
| Jul 3, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION, OBSERVED SUSPENDED SCAFFOLD NOT ADEQUATELY MAINTAINED. SHACKLES WERE IMPROPERLY SECURED, SHACKLE PINS WERE NOT FULLY ENGAGED AND NOT SECURED AGAINST BACKING OUT, AND BASE PLATES WERE NOT #39556166R | Aug 9, 2027 DEFAULT | $10,000 |
| Feb 10, 2020 | Construction CLASS - 2 AT TIME OF INSPECTION I OBSERVED, BRICK ENCLOSURES PARTIALLY REMOVED BOTTOM SECTION FROM APPROX. 13-FOUNDATION COLUMNS IN CELLAR LEVEL PARKING GARAGE TO FIT CARS IN PLACE. ALSO OBSERVED REMAINING ENCLOSED BRICK #39017273J | Jan 7, 2021 IN VIOLATION | $625 |
| Issued | Violation | Status |
|---|---|---|
| Feb 17, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00040 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 17, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 16, 2016 | A | Apt 8J · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING NORTH ROOM 8 STY 2 FROM SOUTHEAST APT 8J. , SECTION '' '' | Feb 19, 2017 |
| Nov 16, 2016 | B | Apt 8J · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED LEAK CEILING NORTH ROOM 8 STY 2 FROM SOUTHEAST APT 8J. , SECTION '' '' | Dec 21, 2016 |
| Nov 16, 2016 | B | Apt 8J · SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING 8 STY 2 FROM SOUTHEAST APT 8J COTTREOL. , SECTION '' '' | Dec 21, 2016 |
| Nov 16, 2016 | A | Apt 11J · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 11J, 11th STORY, 3rd APARTMENT FROM NORTH AT EAST | Feb 19, 2017 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)