3 floors · 3 apartments · 3,428 sq ft · built 1897 · class C0 · owner of record: David Akbar
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 10, 2008 | C | SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING LOCK GATE TO SCUTTLE RECESS 3 STY ER1. | Jun 16, 2008 |
| Jun 10, 2008 | A | SECTION 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CELLAR THRU OUT. | Sep 13, 2008 |
| Jun 10, 2008 | B | SECTION 65 M/D LAW PROVIDE UNDER COMPLETED PERMIT, A PROPER ENCLOSURE FOR THE CENTRAL HEATING PLANT, CELLAR CENTER. | Jul 15, 2008 |
| Jun 10, 2008 | B | D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PLASTERBOARD CELLAR CEILING AT REAR. | Jul 15, 2008 |
| Jun 10, 2008 | A | D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT REAR ROOM 3RD STY APT. | Sep 13, 2008 |
| Jun 10, 2008 | B | D26-10.01 ADM CODE ABATE THE NUISANCE CONSISTING OF PAINTED SPRINKLES HEAD AT 1ST STY PUBLIC HALL. | Jul 15, 2008 |
| Jun 10, 2008 | B | D26-19.05 ADM CODE PROVIDE ADEQUATE LIGHT OF NOT LESS THAN 60 WATTS INCANDESCENT OR EQUIVALENT ILLUMINATION PUBLIC HALL ALL STYS. | Jul 15, 2008 |
| Jun 10, 2008 | B | D26-21.07 ADM CODE PROVIDE A PIECE OF GARDEN HOSE 10 FEET IN LENGTH WITH FEMALE COUPLING AND A 10 QUART PAIL ON PREMISES TO TEST SPRINKLER SYSTEM. | Jul 15, 2008 |
| Jun 10, 2008 | B | D26-10.01, 10.05 ADM CODE FIRE EGRESS DEFECTIVE. MAKE STATIONARY THE IRON LADDER LEADING TO SCUTTLE OPENING IN ROOF AT 3RD STY PUBLIC HALL. | Jul 15, 2008 |
| Jun 10, 2008 | C | D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DOUBLE CYLINDER KEY OPERATED LOCK ENTRANCE DOOR TO BLDG. | Jun 16, 2008 |
| Jun 10, 2008 | C | SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING LOCK ON SCUTTLE COVER TO ROOF ER1. | Jun 16, 2008 |
| Jun 10, 2008 | B | SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF GATE TO SCUTTLE RECESS 3 STY. | Jul 15, 2008 |
| Jun 10, 2008 | A | SECTION 27-2005 ADM CODE PROVIDE PROPER SECURING OF SCUTTLE COVER BY MEANS OF SLIDE BOLT HOOK OR LOCK WHICH DOES NOT REQUIRE A KEY TO OPEN. | Sep 13, 2008 |
| Jun 10, 2008 | A | SECTION 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE ROOF THRU OUT. | Sep 13, 2008 |
| Jun 10, 2008 | B | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ERODED MORTAR JOINTS BRICK CHIMNIES ROOF FRONT & REAR. | Jul 15, 2008 |
| Jun 10, 2008 | A | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS & CEILING 3 STY PUBLIC HALL. | Sep 13, 2008 |
| Jun 10, 2008 | A | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WOOD TRIMS EXTERIOR AROUND ENTRANCE DOOR STREET TO VESTIBULE. | Sep 13, 2008 |
| Jun 10, 2008 | B | SECTION 62, 187, 231 M/D LAW AND DEPT. RULES AND REGS. SAFEGUARD EGRESS BY PROVIDING IRON GUARD RAILS OR PARAPET WALLS 3 FT 6 IN HIGH AND EXTENDING A MINIMUM OF 4 FT 0 IN BEYOND EITHER SIDE OF BULKHEAD/SCUTTLE OPENING AT ROOF ROOF CENTER. | Jul 15, 2008 |
| Oct 22, 2003 | B | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS REQUIRED | Dec 1, 2003 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 8:17 AM ET. BBL 3016750075.