5 floors · 11 apartments · 11,250 sq ft · built 1905 · class C1 · owner of record: 2323 Davidson Bronx Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-24 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 23, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, OBSERVED THE VIOLATING CONDITION HAS BEEN CORRECTED. HOWEVER, NO CERT #39205303J | Dec 4, 2026 PENDING | $1,250 |
| Sep 23, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, OBSERVED THE VIOLATING CONDITION HAS BEEN CORRECTED. HOWEVER, NO CERT #39205301X | Dec 4, 2026 PENDING | $1,250 |
| Sep 23, 2026 | Construction CLASS - 1 UNLAWFUL ACTS - FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. AT TIME OF INSPECTION, NO PERMITS WERE FOUND ON FILE WITH THE DEPARTMENT OF BUILDINGS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER AND CERTIF #39205302H | Dec 4, 2026 PENDING | $2,500 |
| Jun 16, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. ATOI, I OBSERVED AT THE FRONT THE BUILDING AT EXPOSURE#1, AT THE SECOND LEVEL FACADE BRICKS IS BULGING IN VARIOUS AREA OF THE BUILDING FACADE. MISSING HEAD #39192964R | Nov 2, 2026 PENDING | $2,500 |
| May 29, 2026 | Boilers CLASS - 2 WEILMCLAIN BOILER HAS THE BOILER SAFETY DISCHARGE PIPE REDUCED+THE BODY DRAIN PIPE IS MISSING+BOTH OIL SUCTION LINES AT TOP OF OIL TANK ARE MISSING SHUTOFF VALVES;CORRECT VIOLATION+SUBMIT CERTIFICATE OF CORRECT #39190307H | Aug 21, 2026 STIPULATION/IN-VIO | $620 |
| Jun 5, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED WASTE BEING DISCHARGED INTO COURT YARD ILLEGALLY FROM PVC PIPING INSTALL., REPAIR AND/REPLACE #39150130P | Jun 5, 2026 IN VIOLATION | $1,250 |
| Jun 5, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED GAS POWERED EQUIPMENT INSTALLED ON 2ND FLOOR OBSTRUCTING EMERGENCY FIRE ESCAPE WINDOW. POTENTIAL FIRE HAZARD., REPAIR AND/REPLACE #39150131R | Jun 5, 2026 IN VIOLATION | $2,500 |
| Jun 5, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT. OBSERVED PVC PIPE CONNECTED TO WASTE ROUGH SYSTEM. NO PERMITS ON FILE. DISCHARGING INTO COURT YARD ILLEGALLY., OBTAIN PERMIT #39150132Z | Jun 5, 2026 IN VIOLATION | $1,250 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 23, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, OBSERVED THE VIOLATING CONDITION HAS BEEN CORRECTED. HOWEVER, NO CERT | Open |
| Sep 23, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, OBSERVED THE VIOLATING CONDITION HAS BEEN CORRECTED. HOWEVER, NO CERT | Open |
| Sep 23, 2026 | ECB | Construction: UNLAWFUL ACTS - FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. AT TIME OF INSPECTION, NO PERMITS WERE FOUND ON FILE WITH THE DEPARTMENT OF BUILDINGS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER AND CERTIF | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 6:07 PM ET. BBL 2031980044.