2 floors · 3,450 sq ft · built 1929 · class N2 · owner of record: Catholic Home Dependent Children
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 52 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1148 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-01 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jul 10, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,OBSERVED ON EXP1 WEST ELEV,CRACKS IN PARAPET BRIC K WORK,SAGGING,CORRDED METAL LENTELS ON 2ND FLOOR.CRACK IN STUCCO AT P ARAPET.EXP3 EAST ELEV,ERODING BRICK WORK AT 2ND FLOOR.EXP4 SOUTH ELEV, CRACK IN PARAPET #SR0501RF | DOB VIOLATION - ACTIVE |
| Oct 9, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION, OBSERVED ON EXPOSURE #1 WEST ELEV SEVERAL CORRODED,SAGGING METAL LINTELS ON 2FL W/CRACKED & MISSING MORTAR JOINTS, LINTELS SIT ON BRICKS;VERTICAL CRACKS IN BRICKS MORTAR JOINTS @ PARAPET,CRACKS IN PARAPET STUCCO. REMED #SR0501RF | DOB VIOLATION - ACTIVE |
| Jun 21, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INS PECTION OBSERVED AT PARAPET LEVEL OF EXP1 WEST ELEV.OBSERVED CRACKS LO OSE BRICKS MORTAR JOINTS THROUGH OUT THE PARAPET AND AT DIFFERENT LEVE LS OF FACADE.REMEDY:REPAIR AND/OR REPLACE #SR20502DO | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 9, 2026, 3:43 PM ET. BBL 2031460015.