Brooklyn · Block 1550 · Lot 1 · 11233

231 Saratoga Avenue

3 floors · 255,360 sq ft · built 1912 · class W1 · owner of record: Nyc Department Of Parks And Recreation

16open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-17 (Accepted). Agency page

Dec 31, 2026
in 47 days
1 of 4 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 255,360 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1550). Agency page

Dec 31, 2030
in 1508 days
Next due 2030

Open violations

ECB / OATH (9)
IssuedViolationHearingBalance
May 27, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 1ST FL AUDITORIUM CEILING WATER DAMAGE WITH SPALLING PLASTER/PAINT.REM:REPAIRAND/OR REPLACE.
#35731848Y
Jun 15, 2026
POP/IN-VIO
$0
May 27, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NO FIRESTOPPING PER BC 712.3;27-345.NOTED:AT BASEMENT ELECTRIC METER RM 335 WITH INADQUATE/MISSING OF FIRESTOPPING THROUGHOUT VARIOUS AREAS.
#35732000L
Jun 15, 2026
POP/IN-VIO
$0
May 27, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 1ST FL STAIR J BASEMENT STAIR C,G,HALLWAY SMOKE DOOR NEAR RM 635 2ND FL HALLWAY SMOKE DOOR NEAR RM 216 STAIR J 3RD FL HALLWAY SMOKE DOOR NEAR RM 31
#35731847M
Jun 15, 2026
POP/IN-VIO
$0
May 27, 2026Construction CLASS - 2
REISSUE ECB#35691933P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL AUDITORIUM,GYM BASEMENT CAFETERIA EME
#35731846K
Jun 15, 2026
POP/IN-VIO
$0
May 27, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8;27-371(J).NOTED:AT BASEMENT STAIR C INSTALLED/USE WITH KEY LOCKING DEVICE.REM:PROVIDE LEGAL HARDWARE.
#35731849X
Jun 15, 2026
POP/IN-VIO
$0
Apr 25, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:NEXT TO ROOM 282 2 LIGHTS,NEXT TO ROOM 232 6 LIGHTS,NEXT TO ROOM 230 4
#35691933P
Jul 2, 2025
POP/IN-VIO
$0
May 20, 2024Construction CLASS - 2
REISSUE #35675044P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT TIME OF MY INSPECTION I OBSERVED AT THE CAFETERI
#35682761N
Aug 21, 2024
POP/IN-VIO
$0
Apr 19, 2023Construction CLASS - 2
REISSUE #35654704Z FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC 1006.1; 27-381.NOTED:DEFECTIVE EMERGENCY EXIT LIGHTING OBSERVED AT FOLLO
#35675044P
Jul 5, 2023
POP/IN-VIO
$0
May 3, 2022Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:ILLUMINATION FOREXIT,EXIT DISCHARGES AND PUBLIC CORRIDOR PER BC1006.1.NOTED OBSERVED DURING INSPECTION OF AUDITORIUM EMERGENCY LIGHTS,FRONT DOOR LIGHTS NOT
#35654704Z
Oct 12, 2022
POP/IN-VIO
$0
DOB (6)
IssuedViolationStatus
Oct 9, 2024CONSTRUCTION
FAILURE TO MAINTAIN.BLDG LEANING APPRX6" TO 8"@TOP,W/LEAN TO EXP4 THAT BEGIN ON 1ST STORY&CONTINUES TO TOP STORY.COSMETIC RPAIRS W/O PRMT OBSRVD SINCE 2023.RECEVNG WALL@EXP4(WEST) SIDE OF BLDG INTACT.1.FULLY VACATE BLDG UNTIL RPAIRS ARE CMPLTD UNDR PRMT,2.IMMED RTAIN NYSPE STRCTRL ENG TO EVAL ENT BL
#FEU30501BS
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#02707
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#21263
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#21264
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#21265
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#21266
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 16)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 5:28 PM ET. BBL 3015500001.

Look up another building