Queens · Block 13196 · Lot 110 · 11413

231-56 Mentone Avenue

2 floors · 1 apartments · 1,344 sq ft · built 1940 · class A1 · owner of record: Geraldine Scaprinito

12open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
305dto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 305 days
Required only if the owner doesn't live there

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (12) · C 1 · B 10 · A 0
IssuedClassViolationCorrect by
Sep 8, 2025I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R—
Sep 8, 2025CApt 2 · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORYSep 4, 2025
Sep 8, 2025BApt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORYOct 13, 2025
Sep 8, 2025BApt 2 · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2, 2nd STORYOct 13, 2025
Sep 8, 2025BApt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORYOct 13, 2025
Sep 8, 2025BApt 2 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTOct 13, 2025
Sep 8, 2025B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT ALL WALLS AND CEILING AT PUBLIC HALL, 1st STORYOct 13, 2025
Sep 8, 2025B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER CEILING AT PUBLIC HALL, 1st STORYOct 13, 2025
Sep 8, 2025B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT ALL WALLS AND CEILING AT STAIRS AT PUBLIC HALL, 1st STORYOct 13, 2025
Sep 8, 2025B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT ALL WALLS AND CEILING AT PUBLIC HALL, 1st STORYOct 13, 2025
Sep 8, 2025BApt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTOct 13, 2025
Sep 8, 2025B§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT PUBLIC HALL, 1st STORYOct 13, 2025

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 9:21 AM ET. BBL 4131960110.

Look up another building