6 floors · 72 apartments · 84,375 sq ft · built 1935 · class D1 · owner of record: Saint Joseph Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 84,375 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 309 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 6825). Agency page | Dec 31, 2035 in 3352 days | Next due 2035 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-14 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #04865 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #04866 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #05871 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #05872 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 21, 2026 | C | Apt E5 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Nov 14, 2026 |
| Oct 21, 2026 | C | Apt E5 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Nov 16, 2026 |
| Oct 21, 2026 | A | Apt E5 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM NORTH AT EAST WALL, NORTH WALL IN THE BATHROOM LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Jan 24, 2027 |
| Oct 21, 2026 | A | Apt E5 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Jan 24, 2027 |
| Oct 21, 2026 | A | Apt E5 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Jan 24, 2027 |
| Oct 21, 2026 | B | Apt E5 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Nov 25, 2026 |
| Oct 21, 2026 | C | Apt E5 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT | Nov 14, 2026 |
| Oct 21, 2026 | A | Apt E5 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT NORTH, THE KITCHEN LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Jan 24, 2027 |
| Oct 21, 2026 | C | Apt E5 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Nov 14, 2026 |
| Oct 14, 2026 | B | Apt B4 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B4, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Nov 18, 2026 |
| Oct 13, 2026 | B | Apt F10 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F10, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt E7 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E7, 5th STORY, 6th APARTMENT FROM NORTH AT EAST | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt F2 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt C6 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt C11 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C11, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt D2 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D2, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt D6 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D6, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt D7 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D7, 4th STORY, 6th APARTMENT FROM NORTH AT EAST | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt D12 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D12, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Nov 17, 2026 |
| Oct 13, 2026 | B | Apt E5 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Nov 17, 2026 |
| Sep 18, 2026 | A | Apt C3 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT C3, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 22, 2026 |
| Jun 5, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL AT PUBLIC HALL, 6th STORY | Sep 8, 2025 |
| May 15, 2025 | A | Apt B2 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HEAT RISER ESCUTCHEON PLATE AT CEILING IN THE BATHROOM LOCATED AT APT B2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 18, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 21, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
| Oct 21, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM NORTH AT EAST WALL, NORTH WALL IN THE BATHROOM LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD A | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT | Open |
| Oct 21, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT NORTH, THE KITCHEN LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
| Oct 14, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B4, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Oct 13, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F10, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 13, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D4, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Closed |
| Oct 13, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E7, 5th STORY, 6th APARTMENT FROM NORTH AT EAST | Open |
| Oct 13, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Oct 13, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Oct 13, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C11, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 13, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D2, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Oct 13, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D6, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST | Open |
| Oct 13, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D7, 4th STORY, 6th APARTMENT FROM NORTH AT EAST | Open |
| Oct 13, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D12, 4th STORY, 5th APARTMENT FROM NORTH AT EAST | Open |
| Oct 13, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST | Open |
| Sep 18, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT C3, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 4:50 PM ET. BBL 3068250027.