4 floors · 3 apartments · 3,600 sq ft · built 1920 · class S3 · owner of record: The Grand Lodge Of The English Language Jurisdicti
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 307 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-13 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 28, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER I OBSERVED IN CELLAR LACK SUPPORT ON GAS LINE ALSO USING FERNCO COUPLINGS WASTE LINE AND USING PVC PIPING IN MIX BUILDING, REPAIR AND/OR REPLACE #39041943J | Oct 21, 2021 DEFAULT | $3,125 |
| May 28, 2021 | Construction CLASS - 2 WORK WITHOUT A PERMIT. COMBINATION OF COMBUSTIBLE AND NON-COMBUSTIBLE STRUCTURAL SHORING POSTS AND SCREW JACKS INSTALLED IN CELLAR EXTENDING FROM CELLAR SLAB TO BASEMENT FLOOR FRAMING PROVIDING VERTICAL STRUCTU #39041955R | Aug 25, 2022 DEFAULT | $6,250 |
| May 28, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. STAIRS FROM BASEMENT TO CELLAR ARE IN DISREPAIR WITH BOTTOM STAIR TREAD MISSING AND LOWER SECTION OF STAIRS CLOSEST TO CELLAR VERY UNSTABLE., REPAIR AND/OR #39041958M | Oct 21, 2021 DEFAULT | $3,125 |
| Nov 1, 2011 | Construction CLASS - 1 WORK W/O PERMIT.GAS PIPING BEING INSTALLED THROUGHOUT BLDG W/O A PERMIT & IN NON-APPROVED LOCATIONS GAS PIPE INSTALLED IN STAIRWELL (MEANS OF EGRESS).STOP ALL WORK ON GAS PIPE EXCEPT TO MAKE SAFE.REM:OBTAIN PER #34896384Y | Mar 8, 2012 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #03097 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 29, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 2, 2026 |
| Feb 19, 2025 | C | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK ASSEMBLY AT BUILDING ENTRANCE DOOR | Feb 25, 2025 |
| Feb 19, 2025 | C | Apt 1 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 25, 2025 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 5:51 AM ET. BBL 1019200102.