Brooklyn · Block 2788 · Lot 5 · 11206

230 Manhattan Avenue

4 floors · 8 apartments · 5,000 sq ft · built 1920 · class C1 · owner of record: 230 Manhattan Ave Llc

166open violations
$0ECB/OATH penalties owed
32HPD class C (immediately hazardous)
63dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 794 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-14 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Mar 13, 2018Unknown CLASS - 2
UNAPPROVED/UNSAFE/UNSUITABLE,ELECTRICAL EQUIPMENT,APPARATUS,MATERIAL,DEVICES,APPLIANCES OR WIRING IN USE. OBSERVED EXPOSED FUSE HOLDER W/LIVE WIRING CONNECTED TO IT W/O ANY ENCLOSURE ALSO OBSERVED HANGING BY IT
#35312843Z
May 7, 2018
WRITTEN OFF
$0
DOB (2)
IssuedViolationStatus
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#10462
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#37562
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
HPD (162) · C 32 · B 90 · A 40
IssuedClassViolationCorrect by
Sep 28, 2026CApt 3F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT DOOR IN THE ENTRANCE LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 4, 2026
Sep 28, 2026BApt 3F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT EAST WALL IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 2, 2026
Sep 28, 2026BApt 1L · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN LINE AT SINK IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 2, 2026
Sep 28, 2026BApt 1L · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE THE SINK IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 2, 2026
Sep 28, 2026BApt 1L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 2, 2026
Sep 28, 2026CApt 1L · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING MAXIMUM TEMPERATURE 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOct 4, 2026
Sep 28, 2026CApt 1L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT DOOR IN THE ENTRANCE LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOct 4, 2026
Sep 28, 2026CApt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOct 24, 2026
Sep 28, 2026BApt 1L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 2, 2026
Sep 28, 2026BApt 1L · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE THE WASHBASIN IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 2, 2026
Sep 28, 2026BApt 1L · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAINLINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 2, 2026
Sep 28, 2026BApt 1L · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 2, 2026
Sep 28, 2026BApt 1L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 44th ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 2, 2026
Sep 28, 2026AApt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL PANELING AT SOUTH, NORTH AND EAST WALL IN THE 44th ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTJan 1, 2027
Sep 28, 2026CApt 2F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 24, 2026
Sep 28, 2026AApt 2F · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WOOD PANELING AT ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 1, 2027
Sep 28, 2026BApt 1L · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 2, 2026
Sep 28, 2026AApt 2F · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WOOD PANELING AT ALL WALLS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 1, 2027
Sep 28, 2026BApt 2F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 2, 2026
Sep 28, 2026AApt 2F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 1, 2027
Sep 28, 2026BApt 2F · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN THE WASHBASIN IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 2, 2026
Sep 28, 2026BApt 2F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT EAST WALL IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 2, 2026
Sep 28, 2026CApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 4, 2026
Sep 28, 2026BApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 2, 2026
Sep 28, 2026BApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTNov 2, 2026
Sep 25, 2026B§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXIGLASS AT BUILDING ENTRANCE DOOR , 1st STORYOct 30, 2026
Sep 25, 2026C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER LOCK AT BUILDING ENTRANCE , 1st STORYOct 1, 2026
Sep 24, 2026BApt 4R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 29, 2026
Sep 24, 2026CApt 4R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 20, 2026
Sep 24, 2026BApt 4R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 29, 2026
Sep 24, 2026BApt 4R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT CEILING, EAST AND NORTH WALL IN THE BATHROOM LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 29, 2026
Sep 24, 2026BApt 4R · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 29, 2026
Sep 17, 2026BApt 2F · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT WASHBASIN WASTE LINE IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 22, 2026
Sep 17, 2026CApt 2F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 13, 2026
Sep 17, 2026AApt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 21, 2026
Sep 15, 2026C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOMSep 21, 2026
Sep 15, 2026CApt 1R · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHSep 13, 2026
Sep 15, 2026C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT 1ST STORY PUBLIC HALL LEADING TO BASEMENT AT BOILER ROOM, 1st STORYSep 21, 2026
Sep 14, 2026CApt 1L · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTHSep 11, 2026
Sep 11, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING APPROX 125 SQ FEET AT BASEMENTOct 16, 2026
Sep 11, 2026B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT BASEMENTOct 16, 2026
Sep 11, 2026C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BASEMENTSep 25, 2026
Sep 8, 2026BApt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 2R, 2nd STORYOct 13, 2026
Sep 8, 2026B§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF OVERGROWN VEGETATION AT REAR YARDOct 13, 2026
Sep 8, 2026B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT PUBLIC HALL, 4th STORYOct 13, 2026
Sep 8, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 4th STORYOct 13, 2026
Sep 8, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORYDec 12, 2026
Sep 8, 2026B§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXI GLASS AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORYOct 13, 2026
Sep 8, 2026B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF SHOPPING CARTS , BIKES AND HOUSEHOLD ITEMS AT PUBLIC HALL, 4th STORYOct 13, 2026
Sep 8, 2026C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING HASP AND EYE AT HATCH LEADING TO ROOFSep 14, 2026
Sep 8, 2026C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE (MISSING DOOR ) AT BOILER ROOMSep 22, 2026
Sep 8, 2026CApt 1L · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH IN THE ENTRANCE LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTHSep 22, 2026
Sep 8, 2026CApt 1L · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTHSep 4, 2026
Sep 8, 2026BApt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOORS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2R, 2nd STORYOct 13, 2026
Sep 8, 2026BApt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOORS IN THE FOYER LOCATED AT APT 2R, 2nd STORYOct 13, 2026
Sep 8, 2026BApt 2R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL REGLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 2R, 2nd STORYOct 13, 2026
Sep 8, 2026C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT PUBLIC HALL 1ST STORY TO CELLAR AT BOILER ROOMSep 14, 2026
Sep 8, 2026BApt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT WEST WALL IN THE BATHROOM LOCATED AT APT 2R, 2nd STORYOct 13, 2026
Sep 8, 2026B§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE SCUTTLE LADDER LEADING TO ROOF HATCH AT PUBLIC HALL, 4th STORYOct 13, 2026
Sep 8, 2026BApt 2R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL WALL OUTLET AT NORTH IN THE KITCHEN LOCATED AT APT 2R, 2nd STORYOct 13, 2026

Showing 60 of 162. Full list on the agency site.

Issued in the last 120 days

DateSourceWhatNow
Sep 28, 2026HPD C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT DOOR IN THE ENTRANCE LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 28, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT EAST WALL IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 28, 2026HPD B§ 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAIN LINE AT SINK IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD B§ 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE THE SINK IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD C§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING MAXIMUM TEMPERATURE 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT DOOR IN THE ENTRANCE LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD B§ 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE THE WASHBASIN IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD B§ 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN DRAINLINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 44th ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL PANELING AT SOUTH, NORTH AND EAST WALL IN THE 44th ROOM FROM NORTH LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 28, 2026HPD A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WOOD PANELING AT ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 28, 2026HPD B§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WOOD PANELING AT ALL WALLS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 28, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 28, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 28, 2026HPD B§ 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN THE WASHBASIN IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 28, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL AIR VENT AT EAST WALL IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 28, 2026HPD C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 28, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 28, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 3:31 PM ET. BBL 3027880005.

Look up another building