3 floors · 2 apartments · 6,764 sq ft · built 1854 · class S2 · owner of record: 255 Baltic Court Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 44 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-16 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 15, 2025 | Construction CLASS - 2 FAILED TO CERTIFY FOR CORRECTION FOR SUMMONS #39065450H, FILE A CERTIFICATE OF CORRECTION #39144960N | Jun 25, 2025 DEFAULT | $6,250 |
| May 14, 2024 | Construction CLASS - 2 FAILURE TO SIGN OFF PERMITTED JOB REQUIRED BY DEPARTMENT OF BUILDINGS (DOB). DOB RECORD SHOWS THAT WORK UNDER JOB# 320591338 NOT SIGNED OFF, PERMIT EXPIRED. 28-116.4; 28-116.4, COMPLY WITH CODE #39114284J | Aug 26, 2024 STIPULATION/IN-VIO | $0 |
| Jul 7, 2022 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES; NOTED: OBSERVED CRACKS WITH BULGING AT THE FRONT EXTERIOR FACADE WALL. THIS IS A POTENTIAL FALL HAZARD., MAINTAIN EXTERIOR BUILDING WALL #39065450H | Oct 17, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 17, 2025 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO OPEN/EXPOSED MASONRY SECTION WITH LOOSE WOOD INSIDE, CRACKED/SPALLING STUCCO AND CRACKING IN MASONRY/STONES AT EXPOSURE #2 SOUTH ELEVATION. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES AT EXPOSURE #2 SOUTH ELEVATION TO COVER FULL EXPOSURE UNDER DIRECTION OF A LICENSED PROF #SR30609BB | DOB VIOLATION - ACTIVE |
| Nov 17, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28-301.1 OF NYC ADMIN CODE. AS NOTED AT TIME OF INSPECTION OBSERVED AT EXPOSURE 2 EXPOSED BRICK WORK AND CRACKS IN MASONRY. REMEDY: REPAIR AND/OR REPLACE #SR0605BB | DOB VIOLATION - ACTIVE |
| Sep 16, 2022 | CONSTRUCTION FAILURE TO COMPLY W/COMMISSIONER'S ORDER 340793(070822FEU30612ZT)DATED 07/08/22 REQUIRING THE OWNER TO START BLDG REPAIRS UNDER PERMIT FOR THE DAMAGED FACADE. AS OF 09/16/22 THERE ARE NO JOBS FILED IN BIS OR DOB NOW TO REPAIR THE BLDG. REMEDY: IMMED COMPLY W/COMMISSIONER'S ORDER 340793(070822FEU3061 #FEU30605ZT | DOB VIOLATION - ACTIVE |
| Jul 8, 2022 | CONSTRUCTION ATOI, THE FACADES AT EXPS #'S 1 & 2 EXHIBITS EXCESSIVE VERT, HORIZ & DIAGONAL CRACKS. THE STUCCO VENEER IS BOWING OUTWARDLY & SEVERELY CRACKED & FLAKING AT THE 2ND & 3RD FLRS WINDOW LINTEL & SILL TOWARDS ADJOINING BLDGN 228 CRT STR WITH THE POSSIBILITY OF COLLAPSE UNTO PEDESTRIANS TRAVERSING BELOW O #22-02137 | DOB VIOLATION - ACTIVE |
| Jul 8, 2022 | CONSTRUCTION FAIL TO MAINTAIN-EXP1 FACADE FACE BRCKS APPEARD LOOSE,BULGNG OUTWARD & DTACHING FROM BACK UP WALLS(INTERIOR WALL).HORZNTL,VERT &DIAGONAL CRACKS OBSRVD ON EXP1 & EXP2 FACADE WALL OWNR RTAIN NYSPE-EVALU ENTIRE BLDG &PREPARE/FILE RPR DWGS RPRS STRT UNDR PRMT BY 8/15/22 &COMPLT/SIGND OFF BY 10/19/22 #FEU30612ZT | DOB VIOLATION - ACTIVE |
| Jul 8, 2022 | IMMEDIATE EMERGENCY INSTALL APPROXIMATELY 26 FEET OF SIDEWALK SHED COVERING THE ENTIRE FRONT OF THE BUILDING(COURT STREET SIDE)WITH THE 5FT EXTENSION EXTENDE D TO THE FRONT OF 228 COURT STREET IN ORDER TO PROTECT THE PEDESTRIAN BELOW #17034 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 8:05 AM ET. BBL 3003070036.