12open violations
$25,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
427dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 427 days
Next cycle year 2027

Open violations

ECB / OATH (7) · $25,000 owed
IssuedViolationHearingBalance
Oct 16, 2026Unknown CLASS - 2
BUILDING FOOTPRINT (SQ. FT.)8640. OBSERVED NO CONSTRUCTION ACTIVITY TAKIN PLACE AT THE TIME OF INSPECTION. I WALKED AROUND THE OUTSIDE OF THE BUILDING AND YELLED INTO THE SITE THROUGH THE GATE. OBSERVED NO MOVE
#39560696X
Dec 23, 2026
PENDING
$2,500
Sep 12, 2026Unknown CLASS - 2
BC3303.3 WATCHPERSON 10 STORY NEW BUILDING, BUILDING APPROXIMATELY 8640 SQUARE FEET. SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALERT WATCHP
#39559129L
Nov 18, 2026
PENDING
$2,500
Sep 10, 2026Unknown CLASS - 1
BC3301.1.2 AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, UPON REQUEST FOR FIRE SAFETY MANAGER NONE WAS PRESENTED OR AT JOBSITE, FAILURE TO PROVIDE AND MAINTAIN FIRE SAFETY MA
#39559046X
Nov 18, 2026
PENDING
$5,000
Sep 10, 2026Construction CLASS - 1
AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOD DECKING LEVEL, I OBSERVED WORKERS STRIPPING FLOORS AND INSTALLING REBARS. UPON REVIEW OF THE DEPARTMENT RECORD IT REVEL THAT THERE IS NO NEW BU
#39559034Z
Nov 18, 2026
PENDING
$2,500
Sep 10, 2026Construction CLASS - 1
AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, UPON REVIEW OF THE CONSTRUCTION SAFETY WAIVER IT REVEAL THAT THE CONSTRUCTION SAFETY MANAGER SHOULD REPORT WEEKLY TO DOB CONSTRU
#39559045Y
Nov 18, 2026
PENDING
$2,500
Sep 10, 2026Unknown CLASS - 1
BC3303.5.3 AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, I OBSERVED AT EXPOSURE #1, 2 CONCRETE WASHOUT BOX AT STREET AND CONCRETE RESIDUE FLOWING ALL THE WAY DOWN TO THE SEWE
#39559044M
Nov 18, 2026
PENDING
$5,000
Sep 10, 2026Unknown CLASS - 1
BC 3307.2.1 AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, I OBSERVED ONE LARGE GENERATOR ON STREET AT EXPOSURE #1 THAT WAS NOT FULLY BARRICADED, FAILURE TO PROVIDE AND MAINTA
#39559047H
Nov 18, 2026
PENDING
$5,000
DOB (0)

None open.

DOB NOW Safety (5)
IssuedViolationStatus
Oct 21, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 21, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 21, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 21, 2026AEUHAZ FTC-AEU-HAZ
Active
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 17)
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 21, 2026DOB SafetyAEUHAZ: Open
Oct 21, 2026DOB SafetyAEUHAZ: Open
Oct 21, 2026DOB SafetyAEUHAZ: Open
Oct 21, 2026DOB SafetyAEUHAZ: Open
Oct 16, 2026ECBUnknown: BUILDING FOOTPRINT (SQ. FT.)8640. OBSERVED NO CONSTRUCTION ACTIVITY TAKIN PLACE AT THE TIME OF INSPECTION. I WALKED AROUND THE OUTSIDE OF THE BUILDING AND YELLED INTO THE SITE THROUGH THE GATE. OBSERVED NO MOVEOpen
Sep 12, 2026ECBUnknown: BC3303.3 WATCHPERSON 10 STORY NEW BUILDING, BUILDING APPROXIMATELY 8640 SQUARE FEET. SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALERT WATCHPOpen
Sep 10, 2026ECBUnknown: BC3301.1.2 AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, UPON REQUEST FOR FIRE SAFETY MANAGER NONE WAS PRESENTED OR AT JOBSITE, FAILURE TO PROVIDE AND MAINTAIN FIRE SAFETY MAOpen
Sep 10, 2026ECBConstruction: AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOD DECKING LEVEL, I OBSERVED WORKERS STRIPPING FLOORS AND INSTALLING REBARS. UPON REVIEW OF THE DEPARTMENT RECORD IT REVEL THAT THERE IS NO NEW BUOpen
Sep 10, 2026ECBConstruction: AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, UPON REVIEW OF THE CONSTRUCTION SAFETY WAIVER IT REVEAL THAT THE CONSTRUCTION SAFETY MANAGER SHOULD REPORT WEEKLY TO DOB CONSTRUOpen
Sep 10, 2026ECBUnknown: BC3303.5.3 AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, I OBSERVED AT EXPOSURE #1, 2 CONCRETE WASHOUT BOX AT STREET AND CONCRETE RESIDUE FLOWING ALL THE WAY DOWN TO THE SEWEOpen
Sep 10, 2026ECBUnknown: BC 3307.2.1 AT THE TIME OF MY INSPECTION OF A 10 STORY NEW BUILDING AT 5 FLOOR DECKING LEVEL, I OBSERVED ONE LARGE GENERATOR ON STREET AT EXPOSURE #1 THAT WAS NOT FULLY BARRICADED, FAILURE TO PROVIDE AND MAINTAOpen