Manhattan · Block 1263 · Lot 22 · 10036

23 West 47 Street

8 floors · 22,575 sq ft · built 1931 · class O6 · owner of record: Altin Rlty Corp

9open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Annual boiler inspection (3 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-04 (Accepted). Agency page

Dec 31, 2026
in 47 days
1 of 3 without an accepted 2026 report yet
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $335,600 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 830 days
Filing window not open yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Apr 8, 2025Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #904145. REMEDY: SUBMIT ACCEPTABLE REQU
#37034619J
Oct 16, 2025
IN VIOLATION
$0
Apr 26, 2021Construction CLASS - 1
103-04 OWNER FAILED TO REPAIR CONDITIONS W/I TIMEFRAME RECOD BY QEWI.QEWI RECOD REPAIRS BE MADE BY 9/1/20 AS OF 4/26/21 NO SUCH REPAIRS HAVEBEEN MADE AS PER 1RCNY103-04 OWNER DIDNT OBTAIN DEPT APPROVAL TO DEVIA
#35548769K
Apr 21, 2022
IN VIOLATION
$0
DOB (4)
IssuedViolationStatus
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00244
DOB VIOLATION - ACTIVE
Sep 29, 2020CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO EXTERIOR STUCCO WITH MINOR VERTICAL CRACK AT EXPO # 02 ON 4TH TO 8TH FLOOR & APPROX. 24" X 4" SIZE BRICKS OPENING AT 3RD FLOOR LEVEL IN STAIRWELL SHAFT AT 23 WEST 47TH STREET. UNABLE TO DETERMINE THE CA
#20-01332
DOB VIOLATION - ACTIVE
Sep 3, 2008ELEVATOR

#9011/276379
DOB VIOLATION - ACTIVE
Sep 1, 1994LOCAL LAW 62/91 - BOILERS

#02963
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Apr 30, 2019Facades FISPNRF
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
Active
Sep 1, 1994Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 5:09 PM ET. BBL 1012630022.

Look up another building