8 floors · 22,575 sq ft · built 1931 · class O6 · owner of record: Altin Rlty Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-04 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 3 without an accepted 2026 report yet |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $335,600 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 830 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 8, 2025 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #904145. REMEDY: SUBMIT ACCEPTABLE REQU #37034619J | Oct 16, 2025 IN VIOLATION | $0 |
| Apr 26, 2021 | Construction CLASS - 1 103-04 OWNER FAILED TO REPAIR CONDITIONS W/I TIMEFRAME RECOD BY QEWI.QEWI RECOD REPAIRS BE MADE BY 9/1/20 AS OF 4/26/21 NO SUCH REPAIRS HAVEBEEN MADE AS PER 1RCNY103-04 OWNER DIDNT OBTAIN DEPT APPROVAL TO DEVIA #35548769K | Apr 21, 2022 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00244 | DOB VIOLATION - ACTIVE |
| Sep 29, 2020 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO EXTERIOR STUCCO WITH MINOR VERTICAL CRACK AT EXPO # 02 ON 4TH TO 8TH FLOOR & APPROX. 24" X 4" SIZE BRICKS OPENING AT 3RD FLOOR LEVEL IN STAIRWELL SHAFT AT 23 WEST 47TH STREET. UNABLE TO DETERMINE THE CA #20-01332 | DOB VIOLATION - ACTIVE |
| Sep 3, 2008 | ELEVATOR #9011/276379 | DOB VIOLATION - ACTIVE |
| Sep 1, 1994 | LOCAL LAW 62/91 - BOILERS #02963 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Sep 1, 1994 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 5:09 PM ET. BBL 1012630022.