Manhattan · Block 1840 · Lot 7501 · 10025

23 West 104 Street

3 floors · 77 apartments · 85,857 sq ft · built 1986 · class R2 · owner of record: Manhattan Valley Townhouse

63open violations
$0ECB/OATH penalties owed
4HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-19 (Payment Verification In Progress). Agency page

Dec 31, 2026
in 47 days
2 of 2 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 85,857 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1840). Agency page

Dec 31, 2030
in 1508 days
Next due 2030

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Feb 6, 2007Plumbing Hazardous
PLUMBING WORK W/O A PERMIT-HAZARDOUS.LOCATION COMMUNITY ROOM:PLUMBING FIXTURES INSTALLED W/O A PERMIT-HAZARDOUS.COMMUNITY ROOM LOCATED IN BASEMENT OF THE BLDG & 1 KITCHEN SINK, 1 WATER CLOSET,1 LAVATORY INSTAL
#34490681K
Jun 14, 2007
IN VIOLATION
$0
Jan 18, 2007Construction Non-Hazardous
FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME INSPECTION CONTRACTOR FAILED TO PROVIDE APPROVED PLANS UNDER APPLICATION#104645957.REMEDY:STOP WORK PROVIDE APPROVED PLANS
#34543713M
Mar 15, 2007
WRITTEN OFF
$0
May 23, 2005Boilers Non-Hazardous
B4A/16/22A/26/38/40/48A/50A/50B/50C/50D/50E 50-CHIMNEY CLEAN OUT DOOR DEFECTIVE 50A-BOTH BOILER SAFTEY VALVES PIPED TO BOILER ON ONE PIPE 50B-BOTH PRESSURE CONTROLS PIPED TO BOILER ON ONE PIPE 50C-OIL GAUGE DEF
#32047940R
Jul 7, 2005
WRITTEN OFF
$0
DOB (2)
IssuedViolationStatus
Aug 3, 2021FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00041
DOB VIOLATION - ACTIVE
Jun 3, 2021FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00094
DOB VIOLATION - ACTIVE
DOB NOW Safety (24)
IssuedViolationStatus
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Jul 10, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Jul 10, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Jul 10, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Jul 10, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Jul 10, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Jul 10, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Jul 10, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Jul 10, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Jul 10, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Jul 10, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Jul 10, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 3, 2021Benchmarking - LL84 FTF-EN-BENCH
Active
Jun 3, 2021Benchmarking - LL84 FTF-EN-BENCH
Active
HPD (34) · C 4 · B 19 · A 11
IssuedClassViolationCorrect by
Jul 2, 2019B§ 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING MINIMUM OF 100 WATTS AS REQUIRED (LIGHT FIXTURE(S) PRESENT). AT FRONT AREAWAYAug 6, 2019
Apr 20, 2015BSECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS MINIMUM REQUIRED (LIGHT FIXTURES PRESENT)May 25, 2015
Jul 30, 2009AApt 2 · SECTION 27-2005 ADM CODE REFIT FRONT DOOR 1 STY SOUTH APT 2. , SECTION '' ''Nov 2, 2009
Jul 30, 2009AApt 2 · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING 1 STY SOUTH APT 2 BATHROOM EAST ROOM. , SECTION '' ''Nov 2, 2009
Jul 30, 2009AApt 2 · SECTION 27-2005 ADM CODE REFIT ENTRANCE DOOR TO 2 STY SOUTH APT 2 WING 10. , SECTION '' ''Nov 2, 2009
Jul 30, 2009AApt 2 · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE METAL BARS ON DOOR TO TERRACE 2 STY SOUTH APT 2 WING 10. , SECTION '' ''Nov 2, 2009
Jul 30, 2009BApt 2 · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DAMPNESS CEILING SOUTH ROOM & BATHROOM 2 STY SOUTH APT 2 WING 10. , SECTION '' ''Sep 3, 2009
Jul 30, 2009BApt 2 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL BATHROOM 2 STY SOUTH APT 2 WING 10. , SECTION '' ''Sep 3, 2009
Jul 30, 2009BApt 3A · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED LEAK CEILING SOUTH BATHROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Sep 3, 2009
Jul 30, 2009AApt 3A · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING SOUTH BATHROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Nov 2, 2009
Jul 30, 2009BApt 3A · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED LEAK CEILING NORTH BATHROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Sep 3, 2009
Jul 30, 2009AApt 3A · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS NORTH BATHROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Nov 2, 2009
Jul 30, 2009BApt 3A · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GROUT AROUND BATHTUB NORTH BATHROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Sep 3, 2009
Jul 30, 2009BApt 3A · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSED ELECTRICAL WIRES CEILING PRIVATE HALL 3 STY NORTHEAST APT 3A. , SECTION '' ''Sep 3, 2009
Jul 30, 2009BApt 3A · SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES MICE AND ANTS 3 STY NORTHEAST APT 3A. , SECTION '' ''Sep 3, 2009
Jul 30, 2009AApt 3A · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING WEST ROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Nov 2, 2009
Jul 30, 2009BApt 3A · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WASTELINE WASHBASIN NORTH BATHROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Sep 3, 2009
Jul 30, 2009BApt 3A · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL WALL OUTLET COVER SOUTHEAST ROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Sep 3, 2009
Jul 30, 2009BApt 3A · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE NORTH WINDOW SASH UPPER SOUTHEAST ROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Sep 3, 2009
Jul 30, 2009BApt 3A · SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER CENTER WINDOW SASH WEST ROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Sep 3, 2009
Jul 30, 2009BApt 3A · SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE 3 STLY NORTHEAST APT 3A. , SECTION '' ''Sep 3, 2009
Jul 30, 2009BApt 3A · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED LEAK EAST WALL SOUTHEAST ROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Sep 3, 2009
Jul 30, 2009AApt 3A · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING SOUTHEAST ROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Nov 2, 2009
Jul 30, 2009BApt 3A · SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE & ROACHES 3 STY NORTHEAST APT 3A KITCHEN. , SECTION '' ''Sep 3, 2009
Jul 30, 2009BApt 3A · SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WINDOW SPRING BALANCE 3 STY NORTHEAST APT 3A WEST ROOM. , SECTION '' ''Sep 3, 2009
Jul 30, 2009AApt 3A · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL CEILING 3 STY NORTHEAST APT 3A SOUTHEAST ROOM. , SECTION '' ''Nov 2, 2009
Jul 30, 2009AApt 3A · SECTION 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET NORTH BATHROOM 3 STY NORTHEAST APT 3A. , SECTION '' ''Nov 2, 2009
Jul 30, 2009BApt 3A · SECTION 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE WASHBASIN 3 STY NORTHEAST APT 3A NORTH BATHROOM. , SECTION '' ''Sep 3, 2009
Jul 30, 2009AApt 3A · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS 3 STY NORTHEAST APT 3A NORTH SOUTH BATHROOM. , SECTION '' ''Nov 2, 2009
Jul 30, 2009CApt 1B · SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES BATHROOM & KITCHEN BSMT APT 1B 7W 104. LOCATED AT APT 1BAug 5, 2009
Jul 30, 2009CApt 3B · SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES BATHROOM & KITCHEN 2 STY NORTHEAST APT 3B 7W 104. LOCATED AT APT 3BAug 5, 2009
Jul 30, 2009CSECTION 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM 1 STY PUBLIC HALL & DOOR TO HEATING PLANT 7W 104.Aug 5, 2009
Jul 30, 2009CSECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM CELLAR DOOR LOCKED 7W 104.Aug 5, 2009
Jul 30, 2009BApt 2 · SECTION 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS FRONT ENTRANCE 1 STY SOUTH APT 2. , SECTION '' ''Sep 3, 2009

Issued in the last 120 days

DateSourceWhatNow
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 13, 2026, 7:59 PM ET. BBL 1018407501.

Look up another building