Brooklyn · Block 1479 · Lot 1 · 11221

23 Ralph Avenue

1 floors · 5,376 sq ft · built 1918 · class O9 · owner of record: 880 Quincy Llc

4open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
67dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-09-18 (Accepted). Agency page

Dec 31, 2026
in 67 days
1 of 1 without an accepted 2026 report yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 798 days
Next cycle year 2028

Open violations

ECB / OATH (1) · $1,250 owed
IssuedViolationHearingBalance
Oct 6, 2026Construction CLASS - 2
AT THE TIME OF MY DEMOLITION MONITORING INSPECTION I OBSERVED SITE ENCLOSED IN FENCE AT EXP#1/3/4 AND SIDEWALK SHED INSTALLED AT EXP#1/4 -NO CONSTRUCTION FENCE JOB INFORMATION PANEL/SIDEWALK SHED PARAPET PANEL
#39560175K
Dec 16, 2026
PENDING
$1,250
DOB (2)
IssuedViolationStatus
Nov 10, 2025CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: AT TIME OF INSPECTION, EXPOSURE 1 CRACKS, MISSING STONE AND OPEN JOINTS. EXP2 CRACKS & DAMAGED STUCCO. EXP 3 CRACKS AND DAMAGED MASONRY. EXP 4 CRACKS & SPALLING STONE. REMEDY: REPAIR AND/OR REPLACE
#SR0302NS
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#28055
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 6, 2026ECBConstruction: AT THE TIME OF MY DEMOLITION MONITORING INSPECTION I OBSERVED SITE ENCLOSED IN FENCE AT EXP#1/3/4 AND SIDEWALK SHED INSTALLED AT EXP#1/4 -NO CONSTRUCTION FENCE JOB INFORMATION PANEL/SIDEWALK SHED PARAPET PANELOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 7:01 AM ET. BBL 3014790001.

Look up another building