7 floors · 1 apartments · 8,821 sq ft · built 1911 · class K4 · owner of record: Gef Development Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Registered through 2027-09-01 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-10 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $282,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2026-09-08) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 25, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION I OBSERVED A SIDEWALK SHED ERECTED AT EXPOSURE#1 WITH MISSING INFORMATION PANEL WHICH CONTAINS THE STREET ADDRESS, NAME AND THE STATEMENT "FOR MORE INFO WITH THE DETAILS" #39537256R | May 1, 2025 IN VIOLATION | $1,250 |
| Feb 25, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES(SUCH AS NETTING, SIDEWALK SHED, FENCE ETC) WHERE REQUIRED TO PROTECT AND SECURE PUBLIC SAFETY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04.-TECHNICAL REPORT(FISP #35689963N | Aug 24, 2026 IN VIOLATION | $10,000 |
| Issued | Violation | Status |
|---|---|---|
| May 7, 2025 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS #00024 | DOB VIOLATION - ACTIVE |
| Feb 25, 2025 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO BULGING/SHIFTED/LOOSE BRICK ON SOUTH-WEST CHIMNEY. REMEDY: IMMEDIATELY PROVIDE ADDITIONAL ADEQUATE SAFETY MEASURES TO PROTECT THE PUBLIC. MAKE IMMEDIATE REPAIRS UNDER SUPERVISION OF LICENSED PROFESSIONAL. LSO REMOVE/SECURE ALL LOOSE MATERIAL #FA0801JP | DOB VIOLATION - ACTIVE |
| Feb 19, 2025 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #912040 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01383 | DOB VIOLATION - ACTIVE |
| Jul 25, 2006 | ELEVATOR #9011/167335 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| May 7, 2025 | Facades FISPFCS CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 19, 2025 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 8:13 AM ET. BBL 1013880014.