6 floors · 10 apartments · 9,640 sq ft · built 2025 · class D7 · owner of record: 2468 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 59 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 75 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 790 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 21, 2026 | Unknown CLASS - 2 ACTIVE 6STORY NB. OBSERVED INADEQUATE MAKESHIFT PROTECTION FOR ROOF OF ADJACENT PROPERTY AT EXPO2; SSP DID NOT SHOW DETAIL FOR THIS ROOF PROTECTION ELEMENT, NOT COMPLYING WITH 3309.10. ALSO OBSERVED NO PROTECTI #39554452Z | Jun 22, 2027 DEFAULT | $5,000 |
| May 21, 2026 | Unknown CLASS - 2 ACTIVE 6STORY NB. IN THE REAR YARD AT EXPO3, OBSERVED THAT THE WEATHERPROOF INTEGRITY OF THE ADJOINING PROPERTY AT EXPO2 WAS IMPAIRED DUE TO CONSTRUCTION OPERATIONS. NOTED EXPOSED BRICK AND STONE OF ADJ. PROPER #39554449H | Jun 22, 2027 DEFAULT | $5,000 |
| May 21, 2026 | Construction CLASS - 2 ACTIVE 6STORY NB. OBSERVED SIDEWALK SHED INSTALLED AT EXPO1 W/ MAKESHIFT EXTENSIONS UNDERNEATH VERTICAL POSTS. SWS POSTS SIT ON SEVERAL MUDSILLS, CONDITION NOT REFLECTED ON APPROVED SWS PLANS PG 100.02. PLANS S #39554450P | Jun 22, 2027 DEFAULT | $3,125 |
| May 21, 2026 | Unknown CLASS - 2 ACTIVE 6STORY NB. AT EXPO2/3 IN REAR YARD OBSERVED SHORING USED TO BRACE WALLS. NO PE REPORTS TO ENSURE STABILITY OF BRACING. NO APPROVED DESIGN WAS PROVIDED FOR WHAT WAS TO BE DONE IN THIS LOCATION, DRAWING SE #39554451R | Jun 22, 2027 DEFAULT | $5,000 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 3:22 PM ET. BBL 4008350015.