Queens · Block 544 · Lot 19 · 11102

23-30 Newtown Avenue

6 floors · 74 apartments · 57,000 sq ft · built 1928 · class D7 · owner of record: Pharos Realty,

22open violations
$0ECB/OATH penalties owed
7HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 57,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028
Energy audit and retro-commissioning (2034) Likely applies
Local Law 87 · Calendar year 2034
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 544). Agency page

Dec 31, 2034
in 2969 days
Next due 2034
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-24 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Jan 17, 1991ELEVATOR
DEVICE #4P290
#1214D01
VIOLATION UNSERVED ECB-ACTIVE
Jan 17, 1991ELEVATOR
DEVICE #4P289
#1214D02
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (0)

None open.

HPD (20) · C 7 · B 11 · A 2
IssuedClassViolationCorrect by
Oct 16, 2026BApt 2CW · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2CW, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST''Nov 20, 2026
Oct 16, 2026CApt 2CW · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE REPAIR DOOR TO MAKE SELF CLOSING IN THE ENTRANCE LOCATED AT APT 2CW, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST''Oct 30, 2026
Oct 16, 2026CApt 2CW · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2CW, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST''Nov 11, 2026
Oct 16, 2026CApt 2CW · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2CW, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST''Nov 11, 2026
Oct 16, 2026AApt 2CW · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, CEILING AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 2CW, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST''Jan 19, 2027
Sep 21, 2026BApt 5EEAST · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHOct 26, 2026
Sep 21, 2026BApt 5EEAST · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHOct 26, 2026
Sep 21, 2026BApt 5EEAST · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHOct 26, 2026
Sep 21, 2026BApt 5EEAST · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHOct 26, 2026
Sep 21, 2026BApt 5EEAST · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WINDOW FRAME, WINDOW AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHOct 26, 2026
Sep 21, 2026CApt 5EEAST · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHSep 27, 2026
Jul 7, 2026AApt 1BE · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 1BE, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''EAST''Oct 10, 2026
May 13, 2026CApt 1BE · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 5; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 1BE, 1st STORY, SECTIOJun 8, 2026
Nov 21, 2022BApt 6FW · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6FW, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION 'Dec 26, 2022
Nov 21, 2022BApt 3D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''Dec 26, 2022
Nov 21, 2022BApt 3A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''Dec 26, 2022
Nov 21, 2022BApt 3CE · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3CE, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION 'Dec 26, 2022
Nov 21, 2022BApt 4D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 26, 2022
Nov 18, 2022CApt 2CW · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Nov 22, 2022
Nov 18, 2022CApt 2CW · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Nov 22, 2022

Issued in the last 120 days

DateSourceWhatNow
Oct 16, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2CW, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST''Open
Oct 16, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE REPAIR DOOR TO MAKE SELF CLOSING IN THE ENTRANCE LOCATED AT APT 2CW, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST''Open
Oct 16, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2CW, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST''Open
Oct 16, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2CW, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST''Open
Oct 16, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, CEILING AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 2CW, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST''Open
Sep 21, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHOpen
Sep 21, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHOpen
Sep 21, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHOpen
Sep 21, 2026HPD B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHOpen
Sep 21, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WINDOW FRAME, WINDOW AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHOpen
Sep 21, 2026HPD C§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5EEAST, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTHOpen
Aug 25, 2026ECBConstruction: VIOLATION OF PARKING REGULATIONS. NOTED: AT TIME OF INSPECTION OBSERVED RIGHT SIDE OF PREMISES VOLKSWAGEN VEHICLE WITH NY LICENSE PLATE MGX 5570 JUMPED CURB & ILLEGALLY PARKED., CONFORM TO PARKING REGULATIONSClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 12:51 PM ET. BBL 4005440019.

Look up another building