Queens · Block 389 · Lot 33 · 11101

23-07 39 Avenue

8 floors · 44,903 sq ft · built 2019 · class H3 · owner of record: 39th Avenue Hospitality Llc

4open violations
$45,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
116dto Facade inspection report (Cycle 10A)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 116 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 44,903 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 795 days
Next cycle year 2028

Open violations

ECB / OATH (12) · $45,000 owed
IssuedViolationHearingBalance
Sep 4, 2026Construction CLASS - 2
AT TIME OF INSPECTION, OBSERVED IN THE HOT WATER HEATER ROOM ON THE ROOF, PVC BEING USED ON THE TWO UNITS INTAKE VENTS CONTRARY TO FGC 503.4.1, REPAIR AND/OR REPLACE
#39203141R
Nov 10, 2026
PENDING
$1,250
Sep 4, 2026Construction CLASS - 1
AT TIME OF INSPECTION, OBSERVED SPRINKLERS IN THE STORAGE ROOM OBSTRUCTED AGAINST THE WALL EFFECTING THE SPRAY REACH, CONTRARY TO BC903.3.3, REPAIR AND/REPLACE
#39203142Z
Nov 10, 2026
PENDING
$2,500
Sep 2, 2025Construction CLASS - 2
OBSERVED ON THE GROUND FLOOR IN THE FIRE PUMP ROOM SPRINKLER HEAD OBSTRUCTED BY PAINT. OUTSIDE THE FIRE PUMP ROOM SPRINKLER HEAD CAP IS PAINTED AND ADHERED TO THE CEILING WHICH IS CONTRARY TO CODE SECTION BC 90
#39158883X
Nov 18, 2025
DEFAULT
$3,125
Sep 2, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED SECURITY CHAIRS STAGED IN PUBLIC CORRIDORS. LOCATED THROUGHOUT THE BUILDING., REPAIR AND/OR REPLACE
#39158892H
Jul 26, 2027
DEFAULT
$3,125
Sep 2, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSERVED HOLE PENETRATIONS IN TELECOM/DATA ROOMS. LOCATED THROUGHOUT THE BUILDING
#39158893J
Nov 18, 2025
DEFAULT
$6,250
Apr 18, 2019Cranes and Derricks CLASS - 1
INADEQUATE SAFETY MEASURES:OPERATION OF HOISTING EQUIPMENT IN UNSAFE MANNER.8 STORY NEW BUILTHEAD LEVEL.AT THE TIME OF MY INSPECTION I OBSERVED A HOISTING OPERATION IN PROGRESS (UNSAFE)MATERIALS WAS BEING HOIST
#35420842P
Jan 21, 2020
IN VIOLATION
$10,000
Apr 18, 2019Construction CLASS - 2
3307.2.1;FAILURE TO COMPLY WITH DOT REGULATIONS AS PER 34 RCNY 2-05 AND ADMIN CODE PREMISES 19-107 19-108 OR 19-121 8 STORY NEW BUILDING @ BULKHEAD LEVEL AT THE TIME OF MY INSPECTION I OBSERVED WATER BARRIES AN
#35420845K
Jan 21, 2020
IN VIOLATION
$1,250
Apr 18, 2019Construction CLASS - 1
FAILURE TO SAFEGUARD ALL PERSONS ANBD PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.8 STORY NEW BUILDING A BULKHEAD LEVEL.AT THE TIME OF MY INSPECTION I OBSERVED NO OVERHEAD PROTETCION WAS IN PLACE FOR THE ADJOI
#35420843R
Jan 21, 2020
IN VIOLATION
$10,000
Apr 18, 2019Construction CLASS - 1
3308.5;FAILURE TO INSTALLER MAINTAIN VERTICLE SAFETY NEETING SYSTEM AS REQUIRED.8 STOARY NEW BUILDING AT BULKHEAD LEVEL AT THE TIME OF MY INSPECTION I OBSERVED TEH VERTCILE SFATEY NETTING SSTEM WAS NOT INSTALLE
#35420847Y
Jan 21, 2020
IN VIOLATION
$1,250
Apr 18, 2019Construction CLASS - 1
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.8 STORY NEW BUILDING @BULKHEAD LEVEL.AT THE TIME OF INSPECTION I OBSERVED THE HOUSEKEEPING ON THIS SITE WAS NOT KEPT AS REQUIRED AND WAS HAZARD
#35420846M
Jan 21, 2020
IN VIOLATION
$1,250
Mar 4, 2019Construction CLASS - 1
GUARDRAILS MISSING/ADEQUATE;AT TIME OF INSPECTION I OBSERVED AN 8 STORY BUILDING UNDER CONSTRUCTION WITH WORKERS WORKING ON THE 1ST FLR APPROX 10FT WITH NO GUARDRAILS SURROUNDING THE LEADING EDGE THIS CAUSED AN
#35363953J
Jun 11, 2019
IN VIOLATION
$2,500
Mar 4, 2019Construction CLASS - 1
BC3301.2/ADEQUATE MEANS OF EGRESS.AT TIME OF INSPECTION OF ACTIVE CONSTRUCTION OF 8 STORY BUILDING I OBSERVED ONE LADDER ONLY AS EGRESS FROM 1ST FLOOR PROPED ON UNEVEN SOFT SOIL AND NOT PROPERLY EXTENDING 3FT A
#35363955N
Jun 11, 2019
IN VIOLATION
$2,500
DOB (1)
IssuedViolationStatus
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#02267
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 4, 2026ECBConstruction: AT TIME OF INSPECTION, OBSERVED IN THE HOT WATER HEATER ROOM ON THE ROOF, PVC BEING USED ON THE TWO UNITS INTAKE VENTS CONTRARY TO FGC 503.4.1, REPAIR AND/OR REPLACEOpen
Sep 4, 2026ECBConstruction: AT TIME OF INSPECTION, OBSERVED SPRINKLERS IN THE STORAGE ROOM OBSTRUCTED AGAINST THE WALL EFFECTING THE SPRAY REACH, CONTRARY TO BC903.3.3, REPAIR AND/REPLACEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 5:42 AM ET. BBL 4003890033.

Look up another building