6 floors · 41 apartments · 34,560 sq ft · built 1940 · class C6 · owner of record: 219-229 W 144 St Tenants Assoc Hdfc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 34,560 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 777 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-13 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 7, 2026 | Construction CLASS - 1 AGGRAVATED CONDITIONS OBSERVED AT TODAY'S INSPECTION, CONSISTENT WITH VIOLATION #39152200K ISSUED 6/22/2025. OBSERVED BULGING BRICK MASONRY, MISSING MORTAR JOINTS, AND STEP CRACKS ALONG THE EAST AND WEST SIDES #39194976N | Oct 22, 2026 DEFAULT | $6,280 |
| Jun 27, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT EXPOSURE 1(FRONT) FACADE ABOVE 6TH FLOOR WINDOWS PARAPET, VERTICAL AND HORIZONTAL RUNNING, STEP CRACKS, MISSING MORTAR AND BULGING BRICKS., REPAIR AND/R #39152200K | Sep 4, 2025 DEFAULT | $11,622 |
| Issued | Violation | Status |
|---|---|---|
| May 2, 2024 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00334 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00094 | DOB VIOLATION - ACTIVE |
| Dec 1, 2023 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2300492 | DOB VIOLATION - ACTIVE |
| Nov 2, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00112 | DOB VIOLATION - ACTIVE |
| Aug 2, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00156 | DOB VIOLATION - ACTIVE |
| May 2, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00330 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #03334 | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2001383 | DOB VIOLATION - ACTIVE |
| Feb 27, 2009 | CONSTRUCTION #1001JH | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 8, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 24, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| May 2, 2024 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 22, 2024 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Dec 1, 2023 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Nov 2, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 12, 2026 | B | Apt 25 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQFT AT CEILING IN THE KITCHEN LOCATED AT APT 25, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 19067854 ISSUED 13-JUL-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a( | Dec 17, 2026 |
| Aug 21, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE DOOR | Sep 25, 2026 |
| Jul 14, 2026 | B | Apt 25 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 25, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 18, 2026 |
| Jul 14, 2026 | C | Apt 25 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 25, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jul 14, 2026 |
| Jul 14, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM | Jul 20, 2026 |
| Jul 14, 2026 | B | Apt 25 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 25, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 18, 2026 |
| Jul 14, 2026 | B | Apt 25 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 25, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 18, 2026 |
| Jul 14, 2026 | B | Apt 25 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 25, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Aug 18, 2026 |
| Jul 14, 2026 | B | Apt 2 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 18, 2026 |
| Jul 14, 2026 | B | Apt 2 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 18, 2026 |
| Jul 2, 2026 | C | Apt 12 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF GATE PADLOCK AT WINDOW LEADING TO FIRE ESCAPE IN THE KITCHEN LOCATED AT APT 12, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 8, 2026 |
| Jul 2, 2026 | C | Apt 12 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 12, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 2, 2026 |
| Jul 2, 2026 | B | Apt 12 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 12, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 6, 2026 |
| Jul 2, 2026 | B | Apt 12 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 12, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 6, 2026 |
| Jul 2, 2026 | B | Apt 12 · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE AT FIRE ESCAPE WINDOW IN THE KITCHEN LOCATED AT APT 12, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 6, 2026 |
| Jul 2, 2026 | B | Apt 2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 6, 2026 |
| Jul 2, 2026 | B | Apt 2 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 6, 2026 |
| Jul 2, 2026 | C | Apt 2 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 16, 2026 |
| Jul 2, 2026 | B | Apt 2 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Aug 6, 2026 |
| Jul 2, 2026 | B | Apt 12 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 12, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 6, 2026 |
| Jul 2, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Jul 8, 2026 |
| Jun 30, 2026 | C | Apt 42 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 30, 2026 |
| Jun 30, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM | Jul 6, 2026 |
| Jun 22, 2026 | A | Apt 42 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM BUILDING FRONT ENTRANCE TO PANEL AT WEST WALL IN THE KITCHEN LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 25, 2026 |
| Jun 22, 2026 | C | Apt 42 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 21, 2026 |
| Dec 31, 2025 | C | Apt 5 · § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 5, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 31, 2025 |
| Dec 31, 2025 | C | Apt 5 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 31, 2025 |
| Dec 8, 2025 | B | Apt 42 · § 27-2005 HMC: REFIT THE DOOR IN THE ENTRANCE LOCATED AT APT 42, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 12, 2026 |
| Dec 8, 2025 | C | Apt 42 · § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING RISED VINLY TILES FLOOR AT DOOR IN THE ENTRANCE LOCATED AT APT 42, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 22, 2025 |
| Dec 8, 2025 | C | Apt 42 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RADIATOR AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 42, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 14, 2025 |
| Oct 21, 2025 | C | Apt 5 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED ON ENTRANCE DOOR AT ROOM LEADING TO FIRE ESCAPE WINDOW IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 27, 2025 |
| Oct 16, 2025 | B | Apt 5 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 20, 2025 |
| Oct 16, 2025 | B | Apt 5 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 5, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 20, 2025 |
| Oct 16, 2025 | B | Apt 5 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 20, 2025 |
| Oct 16, 2025 | B | Apt 55 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 55, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 20, 2025 |
| Oct 16, 2025 | B | Apt 5 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 20, 2025 |
| Oct 16, 2025 | B | Apt 55 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 55, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 20, 2025 |
| Oct 16, 2025 | C | Apt 55 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 55, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 11, 2025 |
| Oct 16, 2025 | B | Apt 5 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 20, 2025 |
| Oct 14, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Oct 20, 2025 |
| Oct 14, 2025 | C | Apt 55 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 55, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 13, 2025 |
| Oct 9, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCK AT BOILER ROOM | Oct 15, 2025 |
| Oct 7, 2025 | C | Apt 26 · 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Nov 2, 2025 |
| May 12, 2025 | C | Apt 5 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 7, 2025 |
| May 12, 2025 | B | Apt 5 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 16, 2025 |
| May 12, 2025 | B | Apt 5 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 16, 2025 |
| Jul 22, 2024 | C | Apt 43 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 43, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Aug 5, 2024 |
| Jul 15, 2024 | B | Apt 42 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 42, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 19, 2024 |
| Jul 15, 2024 | B | Apt 42 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 42, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 19, 2024 |
| Jul 15, 2024 | C | Apt 42 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 42, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 29, 2024 |
| May 8, 2024 | C | Apt 4 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 3, 2024 |
| Mar 25, 2024 | B | Apt 32 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRINGBALANCE AT UPPER AND LOWER WINDOW SASHES IN THE BATHROOM LOCATED AT APT 32, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 29, 2024 |
| Mar 25, 2024 | B | Apt 32 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SUBFLOORING IN THE PRIVATE HALLWAY LOCATED AT APT 32, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 29, 2024 |
| Mar 25, 2024 | B | Apt 32 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRINGBALANCE AT UPPER AND LOWER SASHES AT SOUTH WINDOW IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 32, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 29, 2024 |
| Mar 25, 2024 | B | Apt 32 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 32, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 29, 2024 |
| Feb 15, 2024 | A | Apt 5 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 5, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 20, 2024 |
| Feb 15, 2024 | A | Apt 5 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, WEST WALL, NORTH WALL IN THE FOYER LOCATED AT APT 5, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 20, 2024 |
| Feb 15, 2024 | A | Apt 5 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, SOUTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 2nd CLOSET FROM EAST AT SOUTH WALL DOOR IN THE 2nd ROOM FROM | May 20, 2024 |
| Feb 15, 2024 | A | Apt 5 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 5, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 20, 2024 |
| Feb 15, 2024 | A | Apt 5 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 5, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | May 20, 2024 |
Showing 60 of 196. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Nov 12, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQFT AT CEILING IN THE KITCHEN LOCATED AT APT 25, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 19067854 ISSUED 13-JUL-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a( | Open |
| Oct 8, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 21, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE DOOR | Closed |
| Aug 21, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE DOOR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 2:56 AM ET. BBL 1020300017.