Manhattan · Block 1827 · Lot 18 · 10026

229 West 111 Street

6 floors · 18 apartments · 21,024 sq ft · built 1920 · class D4 · owner of record: 229 West 111th Street Hdfc

14open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-20 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Jan 20, 2021Construction CLASS - 1
AT TIME OF INSPECTION OBSERVED APPROX. 8'-0" SECTION OF ROOF CORNICE DISLODGED, DETACHED FROM FACADE FRAMING AND HANGING OVER PEDESTRIANS SIDEWALK AT EXPO # 01. PROVIDE OVERHEAD PROTECTION AND ENGINEER'S EVALUA
#39035152M
Aug 26, 2021
IN VIOLATION
$0
DOB (7)
IssuedViolationStatus
Apr 14, 2021FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00063
DOB VIOLATION - ACTIVE
Jan 20, 2021CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED APPROX. 8'-0" SECTION OF ROOF CORNICE DISLODGED, DETACHED FROM FACADE FRAMING AND HANGING OVER PEDESTRIANS SIDEWALK AT EXPO # 01.
#21-00062
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01545
DOB VIOLATION - ACTIVE
May 31, 1994LOCAL LAW 10/81 - ELEVATOR

#03262
DOB VIOLATION - ACTIVE
Jun 29, 1990LOCAL LAW 10/81 - ELEVATOR
1
#02074
DOB VIOLATION - ACTIVE
Oct 12, 1989LOCAL LAW 10/81 - ELEVATOR
1
#02802
DOB VIOLATION - ACTIVE
Dec 13, 1988ELEVATOR
51)RESTORE TO SERVICE SO THAT A PROPER INSPECTION CAN BE MADE BY THIS DEPT BEFORE RUNNING ELEVATOR
#1176C/02
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Apr 14, 2021AEUHAZ FTC-AEU-HAZ
Active
HPD (2) · C 0 · B 1 · A 1
IssuedClassViolationCorrect by
Jan 9, 2015ASECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME IS MISSING AT PUBLIC HALL, 1st STORYApr 14, 2015
Oct 2, 2012BApt 12 · SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING, IN THE BATHROOM LOCATED AT APT 12, 4th STORY, 1st APARTMENT FROM WEST AT NORTHNov 6, 2012

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 2:40 AM ET. BBL 1018270018.

Look up another building