2 floors · 2 apartments · 10,128 sq ft · built 1910 · class M1 · owner of record: New Canaan Baptist Church Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 309 days | Required only if the owner doesn't live there |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-21 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 17, 1993 | Construction Non-Hazardous OCCUPANCY AT ABOVE STRUCTURE IS CONTRARY TO THE CERTIFICATE OF OCCUPA-NCY #(186876):OCCUPANCY HAS BEEN CHANGED FROM USE GROUP 16 WAREHOUSE TO A USE GROUP 18 TRANSFER STATION.ACTIVITIES CONDUCTED AT LOCATION IN #34088850R | Jul 19, 1993 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #07067 | DOB VIOLATION - ACTIVE |
| Apr 19, 2000 | CONSTRUCTION #03T1VW | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 19, 2000 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: 8 FOOT HIGH PLYWOOD FENCE CONSTRUCT ED AT FRONT SIDEWALK AND FRONT YARD, EAST AND WEST SIDE REMEDY: OBTAIN A FENCE PERMIT IF EASIBLE #03T1VW | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Nov 4, 1999 | EMERGENCY #360/99A | DOB VIOLATION - ACTIVE |
| Oct 29, 1999 | EMERGENCY #360/99 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #28110 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 5:00 AM ET. BBL 3018270031.